Expired
public low-water crossing on US Highway 377 over the South Llano River, south of Junction, TX 76849
Hand-pull invasive giant cane and elephant ear from a public Llano River bank, site 1, public low-water crossing on US Highway 377 over the South Llano River, south of Junction, TX 76849.
Two workers hand pull and cut invasive giant cane and elephant ear from the dry bank at public low-water crossing on US Highway 377 over the South Llano River, bagging the cut material until the bank stands clear. Read all of it
Lapsed. Nothing is owed and nothing is waiting.
It is kept here so the link never dies. See work that is open now.
All of it: the words, the place, the proof
Hand-pull invasive giant cane and elephant ear from this Llano River bank near the US 377 crossing south of Junction, site 1. Invasive giant cane (Arundo) and elephant ear have crowded out native riparian understory along this public reach of the spring-fed South Llano River, drinking scarce clear-spring water the native cypress and pecan understory needs far less of.
This one lapsed at $140. Similar work is open on the board.
Safety, read before you claim
Two-person minimum near the water's edge; this job asks for no licence, and larger stems are cut per the site's approved invasive-control protocol. Stay on the dry, accessible bank at all times; never enter the water or a saturated bank edge.
How this work is done
How this work is done
A documented method, so this packet comes out the same whoever does it.
Steps
- 1. Walk the dry, accessible top of the public Llano River bank at this reach and photograph the invasive giant cane (Arundo) or elephant ear stand as found.
- 2. Hand-pull small stems, rhizome sprouts, and elephant-ear corms by the root; for larger cane stems, cut at the base per the site's approved invasive-control protocol, staying on dry ground the whole time.
- 3. Never enter the water or a saturated, unstable bank edge; a two-person minimum works within sight of each other near the water's edge.
- 4. Bag and haul off cut material, photograph the cleared bank from the matching before vantage, and record the species and area treated.
What counts as done
- Before photo of the invasive stand on the bank
- Species (giant cane or elephant ear) and approximate area treated recorded
- Confirmation the work stayed on dry, stable bank ground with a two-person minimum
- After photo of the cleared bank from the matching vantage
Proof is measured against these, not judged by taste.
What is promised, and what is not
Every stage this packet actually passes, claim to settlement, is public in its receipt trail. A stage that has not happened is not claimed.
Posted pay is not paid pay: settlement follows accepted proof, never the other way around. Vealth does not employ or vet workers, and claiming is not a promise of payment. See how proof and receipts work.
Packet WORK_1784886513253_mda96pf