Anyone can start here · resident homes along the North 10th Street / College Street corridor, Junction, TX 76849 (own-home)
Hand-dig a recharge swale and rain garden at a resident's own home on the corridor, home 1, resident homes along the North 10th Street / College Street corridor, Junction, TX 76849 (own-home) (2026-07-24)
This home's roof and yard runoff currently sheets straight off the thin karst soil into the street instead of soaking into the Edwards Aquifer recharge zone, which a hand-dug swale and native planting could slow and hold. Standard: EPA green-infrastructure inspection, bioretention/bioswale/permeable-pavement function + maintenance, capturing runoff before it sheets off thin karst topsoil straight into the Edwards Aquifer recharge zone instead of soaking in. SDG 6.3/11.5. Proof: homeowner/resident-permission record + before/after photos + basin-depth measurement + native-planting record + GPS Method (EPA green-infrastructure inspection, bioretention/bioswale/permeable-pavement function + maintenance, capturing runoff before it sheets off thin karst topsoil straight into the Edwards Aquifer recharge zone instead of soaking in. SDG 6.3/11.5.): 1. 1. Confirm the swale/basin location with the resident, away from the septic field and any buried utility, and photograph the bare site before digging. 2. 2. Hand-dig a shallow swale or basin to the design depth at a low point that already collects roof or yard runoff. 3. 3. Backfill with amended soil and plant native, water-tolerant Edwards Plateau species at the design spacing. 4. 4. Mulch the swale and photograph the finished planting from the matching before vantage, recording species/count and depth. Done when: homeowner/resident-permission record + before/after photos + basin-depth measurement + native-planting record + GPS
How this work is done
A documented method, so this packet comes out the same whoever does it. Typically 30–75 minutes. Method of record: EPA green-infrastructure inspection (bioretention / bioswale / permeable pavement function + maintenance)
Bring
- measuring tape
- GPS phone
- camera
- trowel / probe
- data sheet
- gloves
Steps
- 1. Locate the GI asset; record GPS; identify the type (rain garden / bioswale / permeable pavement / tree filter).
- 2. Photograph the asset, its inlet, and its outlet/overflow.
- 3. Check the inlet and outlet for blockage (sediment, trash, mulch) and note whether flow can enter/leave freely.
- 4. Check for standing water and estimate whether it drains within the design window (typically <24-48h after rain); probe media if dry.
- 5. Assess vegetation/media condition and estimate sediment/trash accumulation depth.
- 6. Note erosion, bypass, or structural damage and list the maintenance needed.
- 7. Enter asset type, condition, inlet/outlet status, drainage observation, sediment level, maintenance needs, GPS, photos; sign.
If it does not match the plan
- Standing water persists > 48h after rain -> flag failed infiltration (clogged media) for rehab.
- Inlet or outlet blocked -> flag for cleaning; the asset isn't capturing runoff.
- Erosion, undercutting, or flow bypassing the asset -> flag for repair.
- Documentation only — no digging out media or altering structures.
What counts as done
- Asset type + overall condition recorded
- Inlet + outlet clear/blocked status recorded
- Standing-water / infiltration observation recorded
- Sediment/trash level + maintenance recommendations + GPS + photos
Proof is measured against these, not judged by taste.
Claiming is free. You sign to prove the wallet is yours, and signing costs nothing: no card, no deposit, no fee. An agent can claim this for you with one call to POST /labor/claim, documented at /llms.txt.
Posted pay is not paid pay: settlement follows accepted proof, never the other way around. Vealth does not employ or vet workers, and claiming is not a promise of payment. See how proof and receipts work.