Anyone can start here · Cove Park and Live Oak Park at Whitney Lake, Ingleside, TX 78362

Check the tidal-marsh wetland condition at Live Oak Park's Whitney Lake, site 1, Cove Park and Live Oak Park at Whitney Lake, Ingleside, TX 78362 (2026-07-27)

This protected tidal-marsh wetland and upland buffer at Whitney Lake and McCampbell Slough has no current condition baseline, and the observation deck's docks and boardwalks give the perfect stand-off vantage to build one. Standard: US EPA National Wetland Condition Assessment rapid method, applied here to the McCampbell Slough and Whitney Lake tidal-marsh wetlands on the Live Oak Peninsula. SDG 6.6 and 15.1. Proof: photo transect from the boardwalk/dock + vegetation-cover estimate + GPS + ranked follow-on note Method (EPA National Wetland Condition Assessment (rapid method), ~45-90 min): 1. Navigate to the wetland edge; record GPS; stay on stable ground. 2. Photograph 3 quadrat stations. 3. At each station, estimate percent cover native vs invasive; identify the dominant invasive. 4. Note hydrology / water level and any disturbance. 5. Enter cover percentages, invasive ID, hydrology, GPS, photos into the proof record; sign. Equipment: GPS phone, quadrat frame, invasive-species ID reference, boots, insect protection, camera Done when: Percent cover native vs invasive recorded at 3 stations; Dominant invasive species identified; Hydrology / water-level note recorded; GPS waypoints + quadrat photos

Where
Cove Park and Live Oak Park at Whitney Lake, Ingleside, TX 78362
Pay
$100 proposed

This packet is not funded yet, so this figure is a proposed price and not money waiting in escrow. If a buyer funds it, approved proof settles that price onchain. If nobody funds it, approved proof earns provable credit toward the work instead of cash. You see which before you claim, never after.

Proof
photo transect from the boardwalk/dock + vegetation-cover estimate + GPS + ranked follow-on note

This is exactly what gets it approved. Nothing settles without it.

Level
entry
Open until
2026-10-26

How this work is done

A documented method, so this packet comes out the same whoever does it. Typically 45–90 minutes. Method of record: EPA National Wetland Condition Assessment (rapid method)

Bring

Steps

  1. 1. Navigate to the wetland edge; record GPS; stay on stable ground.
  2. 2. Photograph 3 quadrat stations.
  3. 3. At each station, estimate percent cover native vs invasive; identify the dominant invasive.
  4. 4. Note hydrology / water level and any disturbance.
  5. 5. Enter cover percentages, invasive ID, hydrology, GPS, photos into the proof record; sign.

If it does not match the plan

What counts as done

Proof is measured against these, not judged by taste.

Claim it on the board

Claiming is free. You sign to prove the wallet is yours, and signing costs nothing: no card, no deposit, no fee. An agent can claim this for you with one call to POST /labor/claim, documented at /llms.txt.

Posted pay is not paid pay: settlement follows accepted proof, never the other way around. Vealth does not employ or vet workers, and claiming is not a promise of payment. See how proof and receipts work.