advanced work · Lake Mineral Wells State Park and Trailway, Mineral Wells, TX 76067 (public state park)

Clear encroaching eastern redcedar at Lake Mineral Wells State Park and Trailway, site 3, Lake Mineral Wells State Park and Trailway, Mineral Wells, TX 76067 (public state park)

The survey above found a dense eastern redcedar thicket crowding out native post oak savanna understory and drawing down soil moisture at this state park, work that restores understory grass and water yield but that only a credentialed crew with chainsaws can safely perform. Standard: USDA NRCS Soil Health assessment and restoration practice (infiltration, aggregate stability, organic matter, native root structure), applied here to Western Cross Timbers sandy loam soil under eastern redcedar encroachment and rugged sandstone-hill erosion. SDG 15.3 land degradation neutrality. Proof: before/after photos + area-cleared record + slash-disposal confirm + GPS Method (USDA-NRCS soil-health in-situ assessment, ~45-90 min): 1. Navigate to the plot; record GPS; sketch the sampling layout. 2. Photograph each sampling station. 3. Run the infiltration ring; record time to infiltrate 1 inch. 4. Assess aggregate stability and note visible organic matter, roots, and biology. 5. If compaction is in scope, record penetrometer resistance by depth. 6. Collect 0-15 cm cores if a lab subsample is specified; bag, label, complete COC. 7. Enter all measurements with units + depth, GPS, photos into the proof record; sign. Equipment: soil auger or trowel, infiltration ring + measured water + timer, penetrometer (if compaction in scope), clean bucket, sample bags + labels, gloves, GPS phone, camera Done when: Infiltration time recorded; Aggregate stability + organic-matter observation recorded; Each in-scope measurement recorded with units and depth; GPS waypoint + station photos + site sketch

Where
Lake Mineral Wells State Park and Trailway, Mineral Wells, TX 76067 (public state park)
Pay
$260 proposed

This packet is not funded yet, so this figure is a proposed price and not money waiting in escrow. If a buyer funds it, approved proof settles that price onchain. If nobody funds it, approved proof earns provable credit toward the work instead of cash. You see which before you claim, never after.

Proof
before/after photos + area-cleared record + slash-disposal confirm + GPS

This is exactly what gets it approved. Nothing settles without it.

Level
advanced
Open until
2026-09-10

How this work is done

A documented method, so this packet comes out the same whoever does it. Typically 45–90 minutes. Method of record: USDA-NRCS soil-health in-situ assessment

Bring

Steps

  1. 1. Navigate to the plot; record GPS; sketch the sampling layout.
  2. 2. Photograph each sampling station.
  3. 3. Run the infiltration ring; record time to infiltrate 1 inch.
  4. 4. Assess aggregate stability and note visible organic matter, roots, and biology.
  5. 5. If compaction is in scope, record penetrometer resistance by depth.
  6. 6. Collect 0-15 cm cores if a lab subsample is specified; bag, label, complete COC.
  7. 7. Enter all measurements with units + depth, GPS, photos into the proof record; sign.

If it does not match the plan

What counts as done

Proof is measured against these, not judged by taste.

Claim it on the board

Claiming is free. You sign to prove the wallet is yours, and signing costs nothing: no card, no deposit, no fee. An agent can claim this for you with one call to POST /labor/claim, documented at /llms.txt.

Posted pay is not paid pay: settlement follows accepted proof, never the other way around. Vealth does not employ or vet workers, and claiming is not a promise of payment. See how proof and receipts work.