advanced work · resident homes along the US Highway 181 corridor, Portland, TX 78374, and near Cove Park, Ingleside, TX 78362 (own-home)

Install hurricane shutter-track hardware at a resident's own home on the corridor, home 2, resident homes along the US Highway 181 corridor, Portland, TX 78374, and near Cove Park, Ingleside, TX 78362 (own-home)

The survey above found unprotected windows at this home ahead of hurricane season, and permanent shutter-track hardware lets the resident deploy storm protection fast the next time a system approaches the Coastal Bend. Standard: FEMA floodplain and coastal storm-surge siting screen, applied here to San Patricio County's Coastal Bend hurricane-season storm-surge and heavy-rain drainage conditions around Portland and Ingleside. SDG 11.5 disaster resilience. Proof: before/after photos + anchor-spec sheet + load-rating confirm + GPS Method (FEMA floodplain + green-infrastructure siting screen, ~45-90 min): 1. Confirm post-event conditions are safe; navigate to the site; record GPS. 2. Photograph deposited sediment / affected area. 3. Measure deposition depth at representative points. 4. If a sediment contaminant screen is in scope, run the metals field kit and record values. 5. Note debris, hazards, and the extent (sketch). 6. Enter depth, any analytes, hazard notes, GPS, photos into the proof record; sign. Equipment: GPS phone, tape/ruler for deposition depth, metals field kit (if sediment screen in scope), boots + gloves, camera Done when: Deposition depth recorded at representative points; Metals screen recorded (if in scope); Debris/hazard note + extent sketch; GPS waypoint + timestamped photos

Where
resident homes along the US Highway 181 corridor, Portland, TX 78374, and near Cove Park, Ingleside, TX 78362 (own-home)
Pay
$240 proposed

This packet is not funded yet, so this figure is a proposed price and not money waiting in escrow. If a buyer funds it, approved proof settles that price onchain. If nobody funds it, approved proof earns provable credit toward the work instead of cash. You see which before you claim, never after.

Proof
before/after photos + anchor-spec sheet + load-rating confirm + GPS

This is exactly what gets it approved. Nothing settles without it.

Level
advanced
Open until
2026-09-10

How this work is done

A documented method, so this packet comes out the same whoever does it. Typically 45–90 minutes. Method of record: FEMA floodplain + green-infrastructure siting screen

Bring

Steps

  1. 1. Confirm post-event conditions are safe; navigate to the site; record GPS.
  2. 2. Photograph deposited sediment / affected area.
  3. 3. Measure deposition depth at representative points.
  4. 4. If a sediment contaminant screen is in scope, run the metals field kit and record values.
  5. 5. Note debris, hazards, and the extent (sketch).
  6. 6. Enter depth, any analytes, hazard notes, GPS, photos into the proof record; sign.

If it does not match the plan

What counts as done

Proof is measured against these, not judged by taste.

Claim it on the board

Claiming is free. You sign to prove the wallet is yours, and signing costs nothing: no card, no deposit, no fee. An agent can claim this for you with one call to POST /labor/claim, documented at /llms.txt.

Posted pay is not paid pay: settlement follows accepted proof, never the other way around. Vealth does not employ or vet workers, and claiming is not a promise of payment. See how proof and receipts work.