Anyone can start here · Antonio Tony Lemus Park (Westside Park), Falfurrias, TX 78355

Document a sand-sheet pothole wetland's condition at Antonio Tony Lemus Park, site 1, Antonio Tony Lemus Park (Westside Park), Falfurrias, TX 78355 (2026-07-28)

A shallow sand-sheet pothole wetland at this public city park has no current condition baseline, and these ephemeral pools are a real recharge point for the shallow Gulf Coast aquifer beneath Brooks County's Sand Sheet. Standard: Watershed health shoreline and wetland-margin condition assessment practice (visual survey and hand planting), applied here to a sand-sheet pothole ephemeral wetland's accessible dry margin near Falfurrias, over the Gulf Coast aquifer recharge zone. SDG 6.6 and 15.1. Proof: document-only stand-off photo log + water-extent estimate + GPS + ranked follow-on note Method (Watershed health shoreline and wetland-margin condition assessment practice (visual survey and hand planting), applied here to a sand-sheet pothole ephemeral wetland's accessible dry margin near Falfurrias, over the Gulf Coast aquifer recharge zone. SDG 6.6 and 15.1.): 1. 1. From the stable, dry margin, photograph a shallow sand-sheet pothole wetland's water extent and litter/debris load without entering the water. 2. 2. Note the approximate water extent, water depth if visibly shallow enough to estimate from the margin, and any litter or dumped debris. 3. 3. Photograph the nearest accessible park reference point for the crew's reference. 4. 4. Record a ranked follow-on note naming the wetland for the native-planting crew. Done when: document-only stand-off photo log + water-extent estimate + GPS + ranked follow-on note

Where
Antonio Tony Lemus Park (Westside Park), Falfurrias, TX 78355
Pay
$90 proposed

This packet is not funded yet, so this figure is a proposed price and not money waiting in escrow. If a buyer funds it, approved proof settles that price onchain. If nobody funds it, approved proof earns provable credit toward the work instead of cash. You see which before you claim, never after.

Proof
document-only stand-off photo log + water-extent estimate + GPS + ranked follow-on note

This is exactly what gets it approved. Nothing settles without it.

Level
entry
Open until
2026-10-27

How this work is done

A documented method, so this packet comes out the same whoever does it. Typically 30–60 minutes. Method of record: EPA dry-weather / AMD field screening

Bring

Steps

  1. 1. Navigate to the outfall/reach; record GPS; photograph it, capturing any visible flow or staining.
  2. 2. Note whether flow is present in dry weather (yes/no).
  3. 3. Measure and record pH, conductivity, and each specified analyte per kit instructions.
  4. 4. Log any color, odor, floc, or aquatic-life observation.
  5. 5. Enter all readings with units, GPS, time, and photos into the proof record; sign.

If it does not match the plan

What counts as done

Proof is measured against these, not judged by taste.

Claim it on the board

Claiming is free. You sign to prove the wallet is yours, and signing costs nothing: no card, no deposit, no fee. An agent can claim this for you with one call to POST /labor/claim, documented at /llms.txt.

Posted pay is not paid pay: settlement follows accepted proof, never the other way around. Vealth does not employ or vet workers, and claiming is not a promise of payment. See how proof and receipts work.