Anyone can start here · William Blair Jr. Park (long known as Rochester Park), 3000 Rochester St, Dallas, TX 75215

Document a curb segment with no stormwater treatment near William Blair Jr. Park, segment 2, William Blair Jr. Park (long known as Rochester Park), 3000 Rochester St, Dallas, TX 75215 (2026-07-28)

A curb and street segment at this park's frontage sheds runoff straight to the storm drain with no vegetated treatment, adding to Bonton's chronic Trinity floodplain street flooding with every storm. Standard: EPA NPDES MS4 stormwater program plus EPA green-infrastructure inspection, bioretention and bioswale function and maintenance, applied here to the Trinity floodplain's chronic street flooding. SDG 6.3 and 11.5. Proof: document-only stand-off photo log + drainage-area estimate + GPS + ranked follow-on note Method (EPA NPDES MS4 stormwater program plus EPA green-infrastructure inspection, bioretention and bioswale function and maintenance, applied here to the Trinity floodplain's chronic street flooding. SDG 6.3 and 11.5.): 1. 1. From the park's public street frontage, photograph a curb and street segment with no stormwater treatment, without entering the roadway. 2. 2. Note the approximate size of the drainage area feeding this curb segment and any ponding observed after rain. 3. 3. Photograph the nearest cross street or park entrance for the crew's reference. 4. 4. Record a ranked follow-on note naming the segment for the bioswale retrofit crew. Done when: document-only stand-off photo log + drainage-area estimate + GPS + ranked follow-on note

Where
William Blair Jr. Park (long known as Rochester Park), 3000 Rochester St, Dallas, TX 75215
Pay
$90 proposed

This packet is not funded yet, so this figure is a proposed price and not money waiting in escrow. If a buyer funds it, approved proof settles that price onchain. If nobody funds it, approved proof earns provable credit toward the work instead of cash. You see which before you claim, never after.

Proof
document-only stand-off photo log + drainage-area estimate + GPS + ranked follow-on note

This is exactly what gets it approved. Nothing settles without it.

Level
entry
Open until
2026-10-27

How this work is done

A documented method, so this packet comes out the same whoever does it. Typically 30–75 minutes. Method of record: EPA green-infrastructure inspection (bioretention / bioswale / permeable pavement function + maintenance)

Bring

Steps

  1. 1. Locate the GI asset; record GPS; identify the type (rain garden / bioswale / permeable pavement / tree filter).
  2. 2. Photograph the asset, its inlet, and its outlet/overflow.
  3. 3. Check the inlet and outlet for blockage (sediment, trash, mulch) and note whether flow can enter/leave freely.
  4. 4. Check for standing water and estimate whether it drains within the design window (typically <24-48h after rain); probe media if dry.
  5. 5. Assess vegetation/media condition and estimate sediment/trash accumulation depth.
  6. 6. Note erosion, bypass, or structural damage and list the maintenance needed.
  7. 7. Enter asset type, condition, inlet/outlet status, drainage observation, sediment level, maintenance needs, GPS, photos; sign.

If it does not match the plan

What counts as done

Proof is measured against these, not judged by taste.

Claim it on the board

Claiming is free. You sign to prove the wallet is yours, and signing costs nothing: no card, no deposit, no fee. An agent can claim this for you with one call to POST /labor/claim, documented at /llms.txt.

Posted pay is not paid pay: settlement follows accepted proof, never the other way around. Vealth does not employ or vet workers, and claiming is not a promise of payment. See how proof and receipts work.