Anyone can start here · resident homes along Bexar Street and near William Blair Jr. Park, Joppa and Bonton neighborhoods, Dallas, TX 75215 (own-home)

Document flood-resilience readiness at a resident's own home, home 1, resident homes along Bexar Street and near William Blair Jr. Park, Joppa and Bonton neighborhoods, Dallas, TX 75215 (own-home) (2026-07-28)

This Trinity floodplain home has never had its downspout routing and low-point drainage checked against a flood-resilience retrofit plan, and no ranked readiness record exists to prioritize the fix. Standard: FEMA floodplain and green-infrastructure siting screen, applied here to the Trinity River floodplain around the Joppa and Bonton neighborhoods of South Dallas. SDG 11.5 disaster resilience. Proof: homeowner/resident-permission record + photo inventory + GPS + ranked readiness note Method (FEMA floodplain and green-infrastructure siting screen, applied here to the Trinity River floodplain around the Joppa and Bonton neighborhoods of South Dallas. SDG 11.5 disaster resilience.): 1. 1. Walk the home's exterior with the resident and photograph the downspout routing and any low-point drainage pooling near the foundation before starting. 2. 2. Note the distance each downspout discharges from the foundation and any grading that channels water back toward the home. 3. 3. Photograph the home's street address for the crew's reference. 4. 4. Record a ranked follow-on note naming the downspout for the diversion install crew. Done when: homeowner/resident-permission record + photo inventory + GPS + ranked readiness note

Where
resident homes along Bexar Street and near William Blair Jr. Park, Joppa and Bonton neighborhoods, Dallas, TX 75215 (own-home)
Pay
$90 proposed

This packet is not funded yet, so this figure is a proposed price and not money waiting in escrow. If a buyer funds it, approved proof settles that price onchain. If nobody funds it, approved proof earns provable credit toward the work instead of cash. You see which before you claim, never after.

Proof
homeowner/resident-permission record + photo inventory + GPS + ranked readiness note

This is exactly what gets it approved. Nothing settles without it.

Level
entry
Open until
2026-10-27

How this work is done

A documented method, so this packet comes out the same whoever does it. Typically 45–90 minutes. Method of record: FEMA floodplain + green-infrastructure siting screen

Bring

Steps

  1. 1. Confirm post-event conditions are safe; navigate to the site; record GPS.
  2. 2. Photograph deposited sediment / affected area.
  3. 3. Measure deposition depth at representative points.
  4. 4. If a sediment contaminant screen is in scope, run the metals field kit and record values.
  5. 5. Note debris, hazards, and the extent (sketch).
  6. 6. Enter depth, any analytes, hazard notes, GPS, photos into the proof record; sign.

If it does not match the plan

What counts as done

Proof is measured against these, not judged by taste.

Claim it on the board

Claiming is free. You sign to prove the wallet is yours, and signing costs nothing: no card, no deposit, no fee. An agent can claim this for you with one call to POST /labor/claim, documented at /llms.txt.

Posted pay is not paid pay: settlement follows accepted proof, never the other way around. Vealth does not employ or vet workers, and claiming is not a promise of payment. See how proof and receipts work.