Anyone can start here · Riverside Park, 302 McCright Dr, Victoria, TX 77901 (public City of Victoria park on the Guadalupe River)
Document a curb segment with no stormwater treatment near Riverside Park, segment 2, Riverside Park, 302 McCright Dr, Victoria, TX 77901 (public City of Victoria park on the Guadalupe River) (2026-07-28)
A curb and street segment at this park's frontage sheds runoff straight to the storm drain with no vegetated treatment, adding to Victoria's chronic Guadalupe floodplain street flooding with every storm. Standard: EPA NPDES MS4 stormwater program plus EPA green-infrastructure inspection, bioretention and bioswale function and maintenance, applied here to Riverside Park's Guadalupe River frontage in Victoria, TX. SDG 6.3 and 11.5. Proof: document-only stand-off photo log + drainage-area estimate + GPS + ranked follow-on note Method (EPA NPDES MS4 stormwater program plus EPA green-infrastructure inspection, bioretention and bioswale function and maintenance, applied here to Riverside Park's Guadalupe River frontage in Victoria, TX. SDG 6.3 and 11.5.): 1. 1. From the park's public street frontage, photograph a curb and street segment with no stormwater treatment, without entering the roadway. 2. 2. Note the approximate size of the drainage area feeding this curb segment and any ponding observed after rain. 3. 3. Photograph the nearest cross street or park entrance for the crew's reference. 4. 4. Record a ranked follow-on note naming the segment for the bioswale retrofit crew. Done when: document-only stand-off photo log + drainage-area estimate + GPS + ranked follow-on note
How this work is done
A documented method, so this packet comes out the same whoever does it. Typically 30–75 minutes. Method of record: EPA green-infrastructure inspection (bioretention / bioswale / permeable pavement function + maintenance)
Bring
- measuring tape
- GPS phone
- camera
- trowel / probe
- data sheet
- gloves
Steps
- 1. Locate the GI asset; record GPS; identify the type (rain garden / bioswale / permeable pavement / tree filter).
- 2. Photograph the asset, its inlet, and its outlet/overflow.
- 3. Check the inlet and outlet for blockage (sediment, trash, mulch) and note whether flow can enter/leave freely.
- 4. Check for standing water and estimate whether it drains within the design window (typically <24-48h after rain); probe media if dry.
- 5. Assess vegetation/media condition and estimate sediment/trash accumulation depth.
- 6. Note erosion, bypass, or structural damage and list the maintenance needed.
- 7. Enter asset type, condition, inlet/outlet status, drainage observation, sediment level, maintenance needs, GPS, photos; sign.
If it does not match the plan
- Standing water persists > 48h after rain -> flag failed infiltration (clogged media) for rehab.
- Inlet or outlet blocked -> flag for cleaning; the asset isn't capturing runoff.
- Erosion, undercutting, or flow bypassing the asset -> flag for repair.
- Documentation only — no digging out media or altering structures.
What counts as done
- Asset type + overall condition recorded
- Inlet + outlet clear/blocked status recorded
- Standing-water / infiltration observation recorded
- Sediment/trash level + maintenance recommendations + GPS + photos
Proof is measured against these, not judged by taste.
Claiming is free. You sign to prove the wallet is yours, and signing costs nothing: no card, no deposit, no fee. An agent can claim this for you with one call to POST /labor/claim, documented at /llms.txt.
Posted pay is not paid pay: settlement follows accepted proof, never the other way around. Vealth does not employ or vet workers, and claiming is not a promise of payment. See how proof and receipts work.