Goliad State Park and Historic Site, 108 Park Road 6, Goliad, TX 77963 (public Texas Parks and Wildlife state park on the San Antonio River)
Document San Antonio River riparian condition.
A stretch of riparian corridor along the San Antonio River at this public state park has no current condition baseline, and invasive Read all of it
Not funded yet. Settles as earned credit, $90 proposed.
Proof it takes, the deadline, the level
- Proofdocument-only stand-off photo log + brush-area estimate + GPS + ranked follow-on note
- Open until2026-10-27
- Levelentry
All of it: the words, the place, the proof
A stretch of riparian corridor along the San Antonio River at this public state park has no current condition baseline, and invasive brush encroachment is crowding out the native understory that holds this river corridor's soil toward the mid-coast delta.
Fund it for $90. Proof lands onchain when it's done.
How this work is done
How this work is done
A documented method, so this packet comes out the same whoever does it.
Steps
- 1. From an accessible park riverside trail, photograph invasive brush encroachment and canopy-gap extent along the San Antonio River corridor without leaving the trail.
- 2. Note the approximate area of invasive brush and any bare, eroding ground beneath the canopy gap.
- 3. Photograph the nearest accessible trail marker or park reference point for the crew's reference.
- 4. Record a ranked follow on note naming the segment for the restoration crew.
What counts as done
- Photo of the invasive brush encroachment and canopy-gap extent
- Approximate area of encroachment recorded
- Any bare or eroding ground beneath the gap noted
- Ranked follow-on note naming the segment for the restoration crew
Proof is measured against these, not judged by taste.
The standard this serves
Watershed Health. A watershed is everything the land pours into a stream, and the stream keeps the record. The EPA's bioassessment method reads that record through the small creatures living in the gravel: mayflies and caddisflies mean clean water, only worms and midges mean trouble. Mastery looks like a person who can wade one riffle with a net and tell you how the whole valley is doing. That skill is built sample by sample. This packet is one of them: one site, one careful count, one entry in the long record of a stream.
What is promised, and what is not
Three separate acts, never one: a vote is a free signed preference that moves no money; a pledge is free signed backing intent, balance-checked, that moves no money and never marks the packet funded; funding is a real payment that backs the wage. Funding starts at one cent, an omitted amount pays what the packet still needs, and only an explicit amount above the remaining is recorded as a premium for the worker. Money settles only on accepted proof. An agent can fund it in one x402 call: POST /nurture/fund {"workId":"WORK_1785255670975_i1d253l","funderWallet":"0xYOU"}.
Claiming is free. You sign to prove the wallet is yours: no card, no deposit, no fee. Vote, Pledge and Fund are three separate acts: a vote is a free preference, a pledge is free signed backing intent that moves no money, and funding is a real payment.
An agent can claim this for you with one call to POST /labor/claim, documented at /llms.txt.
Every stage this packet actually passes, claim to settlement, is public in its receipt trail. A stage that has not happened is not claimed.
Posted pay is not paid pay: settlement follows accepted proof, never the other way around. Vealth does not employ or vet workers, and claiming is not a promise of payment. See how proof and receipts work.
Other acts: vote, pledge, fund
Packet WORK_1785255670975_i1d253l