intermediate work · Antonio Tony Lemus Park (Westside Park), Falfurrias, TX 78355

Plant native sedges and rushes at a sand-sheet pothole wetland margin, Antonio Tony Lemus Park, site 2, Antonio Tony Lemus Park (Westside Park), Falfurrias, TX 78355 (2026-07-28)

The survey above found this sand-sheet pothole wetland's dry margin bare and thin, ground cover that native sedges and rushes would otherwise hold to filter runoff before it reaches the shallow Gulf Coast aquifer below. Standard: Watershed health shoreline and wetland-margin condition assessment practice (visual survey and hand planting), applied here to a sand-sheet pothole ephemeral wetland's accessible dry margin near Falfurrias, over the Gulf Coast aquifer recharge zone. SDG 6.6 and 15.1. Proof: before/after photos + species/count record + GPS Method (Watershed health shoreline and wetland-margin condition assessment practice (visual survey and hand planting), applied here to a sand-sheet pothole ephemeral wetland's accessible dry margin near Falfurrias, over the Gulf Coast aquifer recharge zone. SDG 6.6 and 15.1.): 1. 1. Confirm the planting margin with city parks staff and photograph the bare or thin pothole-wetland margin from the stable dry edge before planting. 2. 2. Work only from the stable, dry margin, never entering standing water or a saturated edge. 3. 3. Plant native wetland-margin sedges and rushes at the design spacing along the accessible dry edge. 4. 4. Water in and photograph the finished planting from the matching before vantage and record species and count. Done when: before/after photos + species/count record + GPS

Where
Antonio Tony Lemus Park (Westside Park), Falfurrias, TX 78355
Pay
$155 proposed

This packet is not funded yet, so this figure is a proposed price and not money waiting in escrow. If a buyer funds it, approved proof settles that price onchain. If nobody funds it, approved proof earns provable credit toward the work instead of cash. You see which before you claim, never after.

Proof
before/after photos + species/count record + GPS

This is exactly what gets it approved. Nothing settles without it.

Level
intermediate
Open until
2026-08-27

How this work is done

A documented method, so this packet comes out the same whoever does it. Typically 30–60 minutes. Method of record: EPA dry-weather / AMD field screening

Bring

Steps

  1. 1. Navigate to the outfall/reach; record GPS; photograph it, capturing any visible flow or staining.
  2. 2. Note whether flow is present in dry weather (yes/no).
  3. 3. Measure and record pH, conductivity, and each specified analyte per kit instructions.
  4. 4. Log any color, odor, floc, or aquatic-life observation.
  5. 5. Enter all readings with units, GPS, time, and photos into the proof record; sign.

If it does not match the plan

What counts as done

Proof is measured against these, not judged by taste.

Claim it on the board

Claiming is free. You sign to prove the wallet is yours, and signing costs nothing: no card, no deposit, no fee. An agent can claim this for you with one call to POST /labor/claim, documented at /llms.txt.

Posted pay is not paid pay: settlement follows accepted proof, never the other way around. Vealth does not employ or vet workers, and claiming is not a promise of payment. See how proof and receipts work.