intermediate work · Bexar Street corridor (public right of way), Joppa and Bonton neighborhoods, Dallas, TX 75215

Clear debris and seed a native flood-buffer meadow on a Bexar Street vacant lot, lot 1, Bexar Street corridor (public right of way), Joppa and Bonton neighborhoods, Dallas, TX 75215 (2026-07-28)

The survey above found this Bexar Street vacant lot bare and debris-strewn, ground that a native pollinator meadow would otherwise hold and slow before a Trinity floodplain downpour reaches the storm drains. Standard: USDA NRCS Soil Health assessment and restoration practice (infiltration, aggregate stability, organic matter, native root structure), applied here to vacant lots in the Trinity floodplain around Joppa and Bonton. SDG 15.3 land degradation neutrality. Proof: before/after photos + debris-volume record + seed-mix/area record + GPS Method (USDA NRCS Soil Health assessment and restoration practice (infiltration, aggregate stability, organic matter, native root structure), applied here to vacant lots in the Trinity floodplain around Joppa and Bonton. SDG 15.3 land degradation neutrality.): 1. 1. Confirm the lot is public or land-banked with city records and photograph the bare, debris-strewn lot before starting. 2. 2. Hand-clear surface debris and trash from the lot, bagging debris for haul off, hand tools only. 3. 3. Hand-broadcast a native pollinator meadow seed mix across the cleared ground at the labeled application rate and rake it in. 4. 4. Water in the seeding and photograph the finished flood-buffer meadow from the matching before vantage, recording the seed mix and area seeded. Done when: before/after photos + debris-volume record + seed-mix/area record + GPS

Where
Bexar Street corridor (public right of way), Joppa and Bonton neighborhoods, Dallas, TX 75215
Pay
$175 proposed

This packet is not funded yet, so this figure is a proposed price and not money waiting in escrow. If a buyer funds it, approved proof settles that price onchain. If nobody funds it, approved proof earns provable credit toward the work instead of cash. You see which before you claim, never after.

Proof
before/after photos + debris-volume record + seed-mix/area record + GPS

This is exactly what gets it approved. Nothing settles without it.

Level
intermediate
Open until
2026-08-27

How this work is done

A documented method, so this packet comes out the same whoever does it. Typically 45–90 minutes. Method of record: USDA-NRCS soil-health in-situ assessment

Bring

Steps

  1. 1. Navigate to the plot; record GPS; sketch the sampling layout.
  2. 2. Photograph each sampling station.
  3. 3. Run the infiltration ring; record time to infiltrate 1 inch.
  4. 4. Assess aggregate stability and note visible organic matter, roots, and biology.
  5. 5. If compaction is in scope, record penetrometer resistance by depth.
  6. 6. Collect 0-15 cm cores if a lab subsample is specified; bag, label, complete COC.
  7. 7. Enter all measurements with units + depth, GPS, photos into the proof record; sign.

If it does not match the plan

What counts as done

Proof is measured against these, not judged by taste.

Claim it on the board

Claiming is free. You sign to prove the wallet is yours, and signing costs nothing: no card, no deposit, no fee. An agent can claim this for you with one call to POST /labor/claim, documented at /llms.txt.

Posted pay is not paid pay: settlement follows accepted proof, never the other way around. Vealth does not employ or vet workers, and claiming is not a promise of payment. See how proof and receipts work.