intermediate work · Riverside Park, 302 McCright Dr, Victoria, TX 77901 (public City of Victoria park on the Guadalupe River)

Build a curb-cut bioswale at Riverside Park's street frontage, segment 3, Riverside Park, 302 McCright Dr, Victoria, TX 77901 (public City of Victoria park on the Guadalupe River)

The survey above found this park frontage segment shedding runoff straight to the storm drain, ground that a hand-dug, native-planted bioswale would otherwise slow and filter before it reaches the Guadalupe River. Standard: EPA NPDES MS4 stormwater program plus EPA green-infrastructure inspection, bioretention and bioswale function and maintenance, applied here to Riverside Park's Guadalupe River frontage in Victoria, TX. SDG 6.3 and 11.5. Proof: before/after photos + swale-dimension record + native-plant list + infiltration water-test + GPS Method (EPA NPDES MS4 stormwater program plus EPA green-infrastructure inspection, bioretention and bioswale function and maintenance, applied here to Riverside Park's Guadalupe River frontage in Victoria, TX. SDG 6.3 and 11.5.): 1. 1. Call 811 and confirm the treatment segment with City of Victoria parks staff, then photograph the flat, untreated curb segment before starting. 2. 2. Hand-dig a shallow, gently sloped swale bed set back from the curb, hand tools only, no power digging equipment. 3. 3. Plant native, water-tolerant grasses and forbs along the swale bed at the design spacing. 4. 4. Water in the planting and photograph the finished bioswale from the matching before vantage, recording the plant list and swale dimensions. Done when: before/after photos + swale-dimension record + native-plant list + infiltration water-test + GPS

Where
Riverside Park, 302 McCright Dr, Victoria, TX 77901 (public City of Victoria park on the Guadalupe River)
Pay
$260 proposed

This packet is not funded yet, so this figure is a proposed price and not money waiting in escrow. If a buyer funds it, approved proof settles that price onchain. If nobody funds it, approved proof earns provable credit toward the work instead of cash. You see which before you claim, never after.

Proof
before/after photos + swale-dimension record + native-plant list + infiltration water-test + GPS

This is exactly what gets it approved. Nothing settles without it.

Level
intermediate
Open until
2026-09-11

How this work is done

A documented method, so this packet comes out the same whoever does it. Typically 30–75 minutes. Method of record: EPA green-infrastructure inspection (bioretention / bioswale / permeable pavement function + maintenance)

Bring

Steps

  1. 1. Locate the GI asset; record GPS; identify the type (rain garden / bioswale / permeable pavement / tree filter).
  2. 2. Photograph the asset, its inlet, and its outlet/overflow.
  3. 3. Check the inlet and outlet for blockage (sediment, trash, mulch) and note whether flow can enter/leave freely.
  4. 4. Check for standing water and estimate whether it drains within the design window (typically <24-48h after rain); probe media if dry.
  5. 5. Assess vegetation/media condition and estimate sediment/trash accumulation depth.
  6. 6. Note erosion, bypass, or structural damage and list the maintenance needed.
  7. 7. Enter asset type, condition, inlet/outlet status, drainage observation, sediment level, maintenance needs, GPS, photos; sign.

If it does not match the plan

What counts as done

Proof is measured against these, not judged by taste.

Claim it on the board

Claiming is free. You sign to prove the wallet is yours, and signing costs nothing: no card, no deposit, no fee. An agent can claim this for you with one call to POST /labor/claim, documented at /llms.txt.

Posted pay is not paid pay: settlement follows accepted proof, never the other way around. Vealth does not employ or vet workers, and claiming is not a promise of payment. See how proof and receipts work.