Anyone can start here · Moody Street corridor between Water Street and Constitution Street, Greens Addition neighborhood, Victoria, TX 77901 (public right of way, representative point, exact subdivision boundary not mapped in the source used)

Mount a permanent flood-stage reference marker on the Moody Street corridor, site 2, Moody Street corridor between Water Street and Constitution Street, Greens Addition neighborhood, Victoria, TX 77901 (public right of way, representative point, exact subdivision boundary not mapped in the source used)

The survey above found a documented Guadalupe River high-water line on this corridor with no permanent public marker, leaving residents with no visible reminder of how high the water reached here before. Standard: FEMA floodplain and green-infrastructure siting screen, applied here to the Guadalupe River floodplain around Victoria, TX, a river that floods this city hard and often. SDG 11.5 disaster resilience. Proof: before/after photos + marker-height record + mount-security confirm + GPS Method (FEMA floodplain and green-infrastructure siting screen, applied here to the Guadalupe River floodplain around Victoria, TX, a river that floods this city hard and often. SDG 11.5 disaster resilience.): 1. 1. Confirm the documented high-water line and a suitable existing public post or fence with city public-works staff before starting. 2. 2. Photograph the existing post or fence at the documented high-water line before mounting anything. 3. 3. Mount a permanent, weatherproof flood-stage reference marker to the existing post with brackets and screws only, no digging, level with the documented high-water line. 4. 4. Photograph the finished, mounted marker from the matching before vantage and record the height above the ground at the marked line. Done when: before/after photos + marker-height record + mount-security confirm + GPS

Where
Moody Street corridor between Water Street and Constitution Street, Greens Addition neighborhood, Victoria, TX 77901 (public right of way, representative point, exact subdivision boundary not mapped in the source used)
Pay
$110 proposed

This packet is not funded yet, so this figure is a proposed price and not money waiting in escrow. If a buyer funds it, approved proof settles that price onchain. If nobody funds it, approved proof earns provable credit toward the work instead of cash. You see which before you claim, never after.

Proof
before/after photos + marker-height record + mount-security confirm + GPS

This is exactly what gets it approved. Nothing settles without it.

Level
entry
Open until
2026-08-27

How this work is done

A documented method, so this packet comes out the same whoever does it. Typically 45–90 minutes. Method of record: FEMA floodplain + green-infrastructure siting screen

Bring

Steps

  1. 1. Confirm post-event conditions are safe; navigate to the site; record GPS.
  2. 2. Photograph deposited sediment / affected area.
  3. 3. Measure deposition depth at representative points.
  4. 4. If a sediment contaminant screen is in scope, run the metals field kit and record values.
  5. 5. Note debris, hazards, and the extent (sketch).
  6. 6. Enter depth, any analytes, hazard notes, GPS, photos into the proof record; sign.

If it does not match the plan

What counts as done

Proof is measured against these, not judged by taste.

Claim it on the board

Claiming is free. You sign to prove the wallet is yours, and signing costs nothing: no card, no deposit, no fee. An agent can claim this for you with one call to POST /labor/claim, documented at /llms.txt.

Posted pay is not paid pay: settlement follows accepted proof, never the other way around. Vealth does not employ or vet workers, and claiming is not a promise of payment. See how proof and receipts work.