← Board

Expired

resident homes in the La Bajada and Los Altos neighborhoods, West Dallas, TX 75212 (own-home)

Document a curb segment with no stormwater treatment near a resident's own home, segment 1, resident homes.

A surveyor on the sidewalk aims a camera at a flat, unplanted curb segment at the resident homes in the La Bajada and Los Altos neighborhoods, noting the street area that drains to it. Read all of it

Lapsed. Nothing is owed and nothing is waiting.

This packet has expired.

It is kept here so the link never dies. See work that is open now.

All of it: the words, the place, the proof

Document a curb segment with no stormwater treatment near a resident's own home. A curb and street segment at this home's frontage sheds runoff straight to the storm drain with no vegetated treatment, adding to West Dallas's heavy downpour street flooding.

This one lapsed at $90. Similar work is open on the board.

What it looks like
A surveyor on the sidewalk aims a camera at a flat, unplanted curb segment at the resident homes in the La Bajada and Los Altos neighborhoods, noting the street area that drains to it.

A description of this kind of work, not a record that it happened here.

Where
resident homes in the La Bajada and Los Altos neighborhoods, West Dallas, TX 75212 (own-home). Open the map
Pay
$90 lapsed

This job expired before anyone claimed it. Nothing is owed and nothing is waiting.

Proof
document-only stand-off photo log + drainage-area estimate + GPS + ranked follow-on note

This is exactly what gets it approved. Nothing settles without it.

Level
entry: anyone can start here
Lapsed
2026-10-27
Posted by
0x034F…6c89

The creator wallet. Its signature is what approves proof and settles the wage.

Safety, read before you claim

No special training is needed. Document only: observe from the sidewalk or yard, never dig or enter the roadway, and visit only with the resident's consent; wear a hi-vis vest near traffic.

How this work is done

How this work is done

A documented method, so this packet comes out the same whoever does it.

Steps

  1. 1. From the home's public street frontage, photograph a curb and street segment with no stormwater treatment, without entering the roadway.
  2. 2. Note the approximate size of the drainage area feeding this curb segment and any ponding observed after rain.
  3. 3. Photograph the nearest cross street for the crew's reference.
  4. 4. Record a ranked follow-on note naming the segment for the bioswale retrofit crew.

What counts as done

  • Photo of the flat, unplanted curb segment
  • Approximate drainage area feeding the segment recorded
  • Any ponding after rain noted
  • Ranked follow on note naming the segment for the bioswale retrofit crew

Proof is measured against these, not judged by taste.

The standard this serves

Green Stormwater Infrastructure. Green stormwater infrastructure is the city's way of handling rain the way a meadow does: rain gardens, planted swales, and permeable pavement that let a storm soak in instead of surging down a pipe. The EPA's inspection standard keeps these systems honest, because a neglected rain garden quietly stops working while still looking like a garden. Mastery is the inspector's eye: reading inlets, overflow, plants, and soil in a single practiced pass. This packet is one such inspection, one basin checked and one record filed, which is precisely how a thousand basins stay alive.

What is promised, and what is not

Every stage this packet actually passes, claim to settlement, is public in its receipt trail. A stage that has not happened is not claimed.

Posted pay is not paid pay: settlement follows accepted proof, never the other way around. Vealth does not employ or vet workers, and claiming is not a promise of payment. See how proof and receipts work.

Packet WORK_1785263657499_uz5zz7z