← Board

Expired

I-10 frontage road corridor and downtown Van Horn, TX 79855 (public right of way)

Document a broken sidewalk segment.

A sidewalk segment along this corridor is missing, badly cracked, or heaved, and no photo record exists to prioritize it for repair.

Lapsed. Nothing is owed and nothing is waiting.

This packet has expired.

It is kept here so the link never dies. See work that is open now.

All of it: the words, the place, the proof

A sidewalk segment along this corridor is missing, badly cracked, or heaved, and no photo record exists to prioritize it for repair.

This one lapsed at $85. Similar work is open on the board.

What it looks like
A surveyor measures a cracked sidewalk panel with a tape measure at I-10 frontage road corridor and downtown Van Horn and photographs it, logging an unrecorded hazard.

A description of this kind of work, not a record that it happened here.

Where
I-10 frontage road corridor and downtown Van Horn, TX 79855 (public right of way). Open the map
Pay
$85 lapsed

This job expired before anyone claimed it. Nothing is owed and nothing is waiting.

Proof
document-only stand-off photo log plus gap/displacement measurement plus GPS plus ranked follow-on note

This is exactly what gets it approved. Nothing settles without it.

Level
entry: anyone can start here
Lapsed
2026-10-27
Posted by
0x034F…6c89

The creator wallet. Its signature is what approves proof and settles the wage.

Safety, read before you claim

Document only, never step onto an unstable or badly cracked panel, observe from the public street or an adjacent stable panel. The licensed city ADA retrofit crew performs the physical repair.

How this work is done

How this work is done

A documented method, so this packet comes out the same whoever does it.

Steps

  1. 1. From the public street or an adjacent stable sidewalk panel, observe and photograph a missing, badly cracked, or unstable sidewalk segment on the corridor, never stepping onto an unstable panel.
  2. 2. Measure the gap or displacement using a tape measure held from a stable stance, and photograph the measurement.
  3. 3. Note the segment's length, approximate age of the damage, and any tripping or wheelchair blocking hazard.
  4. 4. Record a ranked follow on note naming the segment for the city's ADA retrofit sidewalk repair crew.

What counts as done

  • Photo of the damaged/missing segment taken from a stable stance
  • Gap or displacement measurement with a tape measure visible in frame
  • Note of the hazard type (trip lip, missing panel, blocked ADA path)
  • Ranked follow on note naming the segment for the city sidewalk repair crew

Proof is measured against these, not judged by taste.

What is promised, and what is not

Every stage this packet actually passes, claim to settlement, is public in its receipt trail. A stage that has not happened is not claimed.

Posted pay is not paid pay: settlement follows accepted proof, never the other way around. Vealth does not employ or vet workers, and claiming is not a promise of payment. See how proof and receipts work.

Packet WORK_1785275231107_jgofwjn