intermediate work · Salt Basin trough, public county road shoulder, Culberson County, TX 79855

Stabilize a bare gypsum dune or blowout segment, segment 2, Salt Basin trough, public county road shoulder, Culberson County, TX 79855 (2026-07-28)

This segment of the Salt Basin trough's gypsum-veneer ground is actively wind-eroding into a bare blowout, ground that a hand-set brush wattle and native gypsum-adapted planting would otherwise hold in place. Standard: USDA NRCS Soil Health assessment practice (infiltration, aggregate stability, wind-erosion condition) plus SDG 15.3 land degradation neutrality, applied here to the Salt Basin playa margin, gypsum-veneer dune, and bolson floor near Van Horn, Culberson County, Texas, a Chihuahuan Desert endorheic basin. Proof: before/after photos plus wattle-length record plus species/count record plus GPS Method (USDA NRCS Soil Health assessment practice (infiltration, aggregate stability, wind-erosion condition) plus SDG 15.3 land degradation neutrality, applied here to the Salt Basin playa margin, gypsum-veneer dune, and bolson floor near Van Horn, Culberson County, Texas, a Chihuahuan Desert endorheic basin.): 1. 1. Confirm the segment with Culberson County road staff and photograph the bare, wind-eroding gypsum-veneer dune or blowout before starting. 2. 2. Hand-set a low brush wattle or straw-wattle line across the windward face of the bare gypsum ground, hand tools only, no power equipment. 3. 3. Hand-plant gypsum-adapted native shrubs and grasses behind the wattle line at the design spacing. 4. 4. Water in where accessible and photograph the stabilized segment from the matching before vantage, recording the wattle length and species planted. Done when: before/after photos plus wattle-length record plus species/count record plus GPS

Where
Salt Basin trough, public county road shoulder, Culberson County, TX 79855
Pay
$190 proposed

This packet is not funded yet, so this figure is a proposed price and not money waiting in escrow. If a buyer funds it, approved proof settles that price onchain. If nobody funds it, approved proof earns provable credit toward the work instead of cash. You see which before you claim, never after.

Proof
before/after photos plus wattle-length record plus species/count record plus GPS

This is exactly what gets it approved. Nothing settles without it.

Level
intermediate
Open until
2026-08-27

How this work is done

A documented method, so this packet comes out the same whoever does it. Typically 45–90 minutes. Method of record: USDA-NRCS soil-health in-situ assessment

Bring

Steps

  1. 1. Navigate to the plot; record GPS; sketch the sampling layout.
  2. 2. Photograph each sampling station.
  3. 3. Run the infiltration ring; record time to infiltrate 1 inch.
  4. 4. Assess aggregate stability and note visible organic matter, roots, and biology.
  5. 5. If compaction is in scope, record penetrometer resistance by depth.
  6. 6. Collect 0-15 cm cores if a lab subsample is specified; bag, label, complete COC.
  7. 7. Enter all measurements with units + depth, GPS, photos into the proof record; sign.

If it does not match the plan

What counts as done

Proof is measured against these, not judged by taste.

Claim it on the board

Claiming is free. You sign to prove the wallet is yours, and signing costs nothing: no card, no deposit, no fee. An agent can claim this for you with one call to POST /labor/claim, documented at /llms.txt.

Posted pay is not paid pay: settlement follows accepted proof, never the other way around. Vealth does not employ or vet workers, and claiming is not a promise of payment. See how proof and receipts work.