Anyone can start here · Point Comfort City Park, Point Comfort, TX 77978

Document the Lavaca Bay shoreline context near a former industrial discharge Superfund site, site 5, Point Comfort City Park, Point Comfort, TX 77978 (2026-07-29)

This stretch of Lavaca Bay shoreline sits near a former industrial discharge Superfund site with long documented mercury contamination in bay sediment and fish tissue, and a current public photo record of posted advisory signage helps residents and regulators track the long term cleanup and monitoring effort. Standard: US EPA soil screening levels for residential and ecological exposure, applied here as a document only stand off survey of the Lavaca Bay mercury legacy sediment context from the public grounds of Point Comfort City Park, Point Comfort, Calhoun County, Texas, a former industrial discharge Superfund site under long term federal cleanup and monitoring. SDG 3.9 and 12.4 hazardous material reduction. Proof: document only stand off photo log plus advisory signage note plus GPS plus ranked follow on note Method (US EPA soil screening levels for residential and ecological exposure, applied here as a document only stand off survey of the Lavaca Bay mercury legacy sediment context from the public grounds of Point Comfort City Park, Point Comfort, Calhoun County, Texas, a former industrial discharge Superfund site under long term federal cleanup and monitoring. SDG 3.9 and 12.4 hazardous material reduction.): 1. 1. From Point Comfort City Park, a public park and vantage point, photograph the bay shoreline and any visible advisory or monitoring signage without touching the water, sediment, or shoreline. 2. 2. Note any posted fish or shellfish consumption advisory signage visible from the public park. 3. 3. Photograph the nearest park sign or mile marker for reference. 4. 4. Record a ranked follow on note naming the segment for a licensed environmental assessor's review, never collect a physical sample. Done when: document only stand off photo log plus advisory signage note plus GPS plus ranked follow on note

Where
Point Comfort City Park, Point Comfort, TX 77978
Pay
$95 proposed

This packet is not funded yet, so this figure is a proposed price and not money waiting in escrow. If a buyer funds it, approved proof settles that price onchain. If nobody funds it, approved proof earns provable credit toward the work instead of cash. You see which before you claim, never after.

Proof
document only stand off photo log plus advisory signage note plus GPS plus ranked follow on note

This is exactly what gets it approved. Nothing settles without it.

Level
entry
Open until
2026-08-28

How this work is done

A documented method, so this packet comes out the same whoever does it. Typically 45–90 minutes. Method of record: EPA soil screening (composite surface sample, XRF/field kit)

Bring

Steps

  1. 1. Navigate to the parcel; record GPS; sketch a >=5-point sampling grid.
  2. 2. Photograph each sampling point and any visible staining/fill/slag.
  3. 3. Collect 0-15 cm cores from >=5 points; combine and mix in the clean bucket; subsample.
  4. 4. Run XRF/test kit on the composite; record each metal in ppm.
  5. 5. If petroleum is in scope, log PID readings and any odor/staining.
  6. 6. Bag/label any lab subsample; complete chain-of-custody.
  7. 7. Enter all analytes with units, depth, GPS, photos, and site sketch into the proof record; sign.

If it does not match the plan

What counts as done

Proof is measured against these, not judged by taste.

Claim it on the board

Claiming is free. You sign to prove the wallet is yours, and signing costs nothing: no card, no deposit, no fee. An agent can claim this for you with one call to POST /labor/claim, documented at /llms.txt.

Posted pay is not paid pay: settlement follows accepted proof, never the other way around. Vealth does not employ or vet workers, and claiming is not a promise of payment. See how proof and receipts work.