intermediate work · Powderhorn Wildlife Management Area, 10769 FM 1289, Port O'Connor, TX 77982 (public state wildlife management area)

Restore a coastal prairie pothole wetland at Powderhorn Wildlife Management Area, basin 3, Powderhorn Wildlife Management Area, 10769 FM 1289, Port O'Connor, TX 77982 (public state wildlife management area) (2026-07-29)

This coastal prairie pothole and depression wetland basin at Powderhorn Wildlife Management Area is losing its native cover to invasive plants, ground migrating waterfowl and the region's amphibians otherwise depend on. Standard: USDA NRCS Soil Health assessment plus wetland restoration practice, applied here to coastal prairie pothole and depression wetlands at Powderhorn Wildlife Management Area, Calhoun County, Texas. SDG 15.1 and 6.6 wetland ecosystems. Proof: before after photos plus area cleared record plus species and count record plus GPS Method (USDA NRCS Soil Health assessment plus wetland restoration practice, applied here to coastal prairie pothole and depression wetlands at Powderhorn Wildlife Management Area, Calhoun County, Texas. SDG 15.1 and 6.6 wetland ecosystems.): 1. 1. Confirm the treatment pothole or depression wetland segment with Texas Parks and Wildlife staff and photograph the invasive choked or bare basin before starting. 2. 2. Hand clear invasive plants from the pothole's margin and basin with hand tools only, no power equipment. 3. 3. Hand plant native wetland margin grasses and forbs at the design spacing to restore the basin's native cover. 4. 4. Photograph the restored pothole from the matching before vantage and record species and count. Done when: before after photos plus area cleared record plus species and count record plus GPS

Where
Powderhorn Wildlife Management Area, 10769 FM 1289, Port O'Connor, TX 77982 (public state wildlife management area)
Pay
$175 proposed

This packet is not funded yet, so this figure is a proposed price and not money waiting in escrow. If a buyer funds it, approved proof settles that price onchain. If nobody funds it, approved proof earns provable credit toward the work instead of cash. You see which before you claim, never after.

Proof
before after photos plus area cleared record plus species and count record plus GPS

This is exactly what gets it approved. Nothing settles without it.

Level
intermediate
Open until
2026-08-28

How this work is done

A documented method, so this packet comes out the same whoever does it. Typically 45–90 minutes. Method of record: USDA-NRCS soil-health in-situ assessment

Bring

Steps

  1. 1. Navigate to the plot; record GPS; sketch the sampling layout.
  2. 2. Photograph each sampling station.
  3. 3. Run the infiltration ring; record time to infiltrate 1 inch.
  4. 4. Assess aggregate stability and note visible organic matter, roots, and biology.
  5. 5. If compaction is in scope, record penetrometer resistance by depth.
  6. 6. Collect 0-15 cm cores if a lab subsample is specified; bag, label, complete COC.
  7. 7. Enter all measurements with units + depth, GPS, photos into the proof record; sign.

If it does not match the plan

What counts as done

Proof is measured against these, not judged by taste.

Claim it on the board

Claiming is free. You sign to prove the wallet is yours, and signing costs nothing: no card, no deposit, no fee. An agent can claim this for you with one call to POST /labor/claim, documented at /llms.txt.

Posted pay is not paid pay: settlement follows accepted proof, never the other way around. Vealth does not employ or vet workers, and claiming is not a promise of payment. See how proof and receipts work.