Anyone can start here · Moore Park, US Highway 90 E, Del Rio, TX 78840 (public city park)
Document a giant reed stand along San Felipe Creek at Moore Park, site 1, Moore Park, US Highway 90 E, Del Rio, TX 78840 (public city park) (2026-07-29)
This bottomland segment along San Felipe Creek toward the Rio Grande is choked with dense giant reed, crowding out native bottomland cover with no photo record to prioritize it for hand clearing. Standard: USDA NRCS CPS 391 riparian forest buffer plus EPA nonpoint source BMP practice, applied here to the Rio Grande and San Felipe Creek bottomland at Moore Park, Del Rio, Val Verde County, Texas. SDG 6.6 and 15.1. Proof: document only stand off photo log plus extent estimate plus GPS plus ranked follow on note Method (USDA NRCS CPS 391 riparian forest buffer plus EPA nonpoint source BMP practice, applied here to the Rio Grande and San Felipe Creek bottomland at Moore Park, Del Rio, Val Verde County, Texas. SDG 6.6 and 15.1.): 1. 1. From an established Moore Park trail, photograph a giant reed choked bottomland segment along San Felipe Creek without entering the water. 2. 2. Note the approximate extent of the giant reed stand visible from the trail. 3. 3. Photograph the nearest trail marker or park sign for the crew's reference. 4. 4. Record a ranked follow on note naming the segment for the giant reed control install crew. Done when: document only stand off photo log plus extent estimate plus GPS plus ranked follow on note
How this work is done
A documented method, so this packet comes out the same whoever does it. Typically 90–180 minutes. Method of record: Urban-creek riparian restoration install (native buffer planting, bank stabilization, invasive/litter removal) per NRCS CPS 391 riparian forest buffer + EPA nonpoint-source BMP practice -- hands-on restoration, not a bioassessment survey; assess->clear->plant/stabilize->verify
Bring
- shovel / dibble bar
- native bare-root or plug plantings (locally sourced)
- erosion-control matting or willow stakes (bank-stabilization sites)
- loppers / hand saw (invasive removal)
- gloves + trash bags (litter pass)
- camera
- GPS-enabled phone
Steps
- 1. Walk the reach with the site plan (or the standing bioassessment/watershed-health finding, if one exists) and photograph the bank/buffer segment as found: bare soil, invasive cover, litter, erosion.
- 2. Clear invasive growth and litter from the planting zone by hand, bagging trash separately from green waste; leave native volunteers in place.
- 3. Plant native riparian species (or set willow stakes / erosion-control matting) at the spacing and depth the site plan calls for, working from the top of bank downward; water each planting in.
- 4. Stake or anchor any erosion-control matting so it will not lift in the next high-flow event, and mulch around new plantings kept clear of stems.
- 5. Photograph the finished segment from the matching vantage, record species/count or matting area installed, and note any follow-up watering the planting needs.
If it does not match the plan
- Steep, actively eroding or undercut bank -> stabilize with matting/stakes before planting; never plant into a bank that is still actively failing.
- Standing or fast-moving water in the work zone -> stay on the bank, never enter the channel; document from the bank and reschedule if the reach is unsafe.
- Suspected illicit discharge, sheen, or odor in the reach -> stop, photograph from a safe distance, do not touch, and report to the MS4/311 line rather than working through it.
What counts as done
- Before photo of the reach segment (bare soil, invasive cover, litter, or erosion as found)
- Invasive/litter removal photo-documented, green waste separated from trash
- Planting or matting installed to spec (species/count or matting area recorded) with after photo from matching vantage
- Erosion-control matting/stakes secured against the next high-flow event, and follow-up watering need noted
Proof is measured against these, not judged by taste.
Claiming is free. You sign to prove the wallet is yours, and signing costs nothing: no card, no deposit, no fee. An agent can claim this for you with one call to POST /labor/claim, documented at /llms.txt.
Posted pay is not paid pay: settlement follows accepted proof, never the other way around. Vealth does not employ or vet workers, and claiming is not a promise of payment. See how proof and receipts work.