intermediate work · the public boat ramp and lake park on Lake LBJ, Kingsland, TX 78639

Install a clean, drain, and dry decontamination station at a Highland Lakes boat ramp, station 1, the public boat ramp and lake park on Lake LBJ, Kingsland, TX 78639

The survey above found this public boat ramp with no clean, drain, and dry signage or boot and trailer brush station, and installing one is the concrete step that keeps giant salvinia and other hitchhiking invasive plants out of the Highland Lakes. Standard: US EPA Rapid Bioassessment Protocols plus Texas Parks and Wildlife Department and LCRA aquatic invasive species management guidance (all vegetation management on Lake Buchanan, Inks Lake, Lake LBJ, Lake Marble Falls, or Lake Travis requires advance TPWD and LCRA approval), applied here to the Highland Lakes reservoir chain at Marble Falls, Burnet County and Kingsland, Llano County, Texas. SDG 6.3 and 6.6. Proof: before after photos plus signage and brush station spec record plus GPS Method (US EPA Rapid Bioassessment Protocols plus Texas Parks and Wildlife Department and LCRA aquatic invasive species management guidance (all vegetation management on Lake Buchanan, Inks Lake, Lake LBJ, Lake Marble Falls, or Lake Travis requires advance TPWD and LCRA approval), applied here to the Highland Lakes reservoir chain at Marble Falls, Burnet County and Kingsland, Llano County, Texas. SDG 6.3 and 6.6.): 1. 1. Confirm the install location with the public parks or lake authority staff and photograph the bare ramp entrance before starting. 2. 2. Set and anchor the clean, drain, and dry signage post at the ramp entrance with hand tools only, no power equipment. 3. 3. Mount the boot and trailer brush station near the ramp entrance, connecting a hose bib rinse point where available. 4. 4. Photograph the finished signage and brush station from the matching before vantage and record the install. Done when: before after photos plus signage and brush station spec record plus GPS

Where
the public boat ramp and lake park on Lake LBJ, Kingsland, TX 78639
Pay
$175 proposed

This packet is not funded yet, so this figure is a proposed price and not money waiting in escrow. If a buyer funds it, approved proof settles that price onchain. If nobody funds it, approved proof earns provable credit toward the work instead of cash. You see which before you claim, never after.

Proof
before after photos plus signage and brush station spec record plus GPS

This is exactly what gets it approved. Nothing settles without it.

Level
intermediate
Open until
2026-09-12

How this work is done

A documented method, so this packet comes out the same whoever does it. Typically 30–60 minutes. Method of record: EPA dry-weather / AMD field screening

Bring

Steps

  1. 1. Navigate to the outfall/reach; record GPS; photograph it, capturing any visible flow or staining.
  2. 2. Note whether flow is present in dry weather (yes/no).
  3. 3. Measure and record pH, conductivity, and each specified analyte per kit instructions.
  4. 4. Log any color, odor, floc, or aquatic-life observation.
  5. 5. Enter all readings with units, GPS, time, and photos into the proof record; sign.

If it does not match the plan

What counts as done

Proof is measured against these, not judged by taste.

Claim it on the board

Claiming is free. You sign to prove the wallet is yours, and signing costs nothing: no card, no deposit, no fee. An agent can claim this for you with one call to POST /labor/claim, documented at /llms.txt.

Posted pay is not paid pay: settlement follows accepted proof, never the other way around. Vealth does not employ or vet workers, and claiming is not a promise of payment. See how proof and receipts work.