Anyone can start here · Pine Springs Visitor Center, 400 Pine Canyon Drive, Salt Flat, TX 79847 (public National Park Service visitor center at the mouth of Pine Springs Canyon)

Document a canyon mouth wash segment near the Pine Springs Visitor Center, site 2, Pine Springs Visitor Center, 400 Pine Canyon Drive, Salt Flat, TX 79847 (public National Park Service visitor center at the mouth of Pine Springs Canyon) (2026-07-30)

This canyon mouth wash segment near the Pine Springs Visitor Center shows invasive plant cover or bare eroding soil with no photo record to prioritize it for hand restoration. Standard: USDA NRCS CPS 391 riparian forest buffer plus EPA nonpoint source BMP practice, applied here to the Pine Springs Canyon mouth riparian corridor near the Pine Springs Visitor Center, Guadalupe Mountains National Park, Culberson County. SDG 6.6 and 15.1. Proof: document only stand off photo log plus segment condition note plus GPS plus ranked follow on note Method (USDA NRCS CPS 391 riparian forest buffer plus EPA nonpoint source BMP practice, applied here to the Pine Springs Canyon mouth riparian corridor near the Pine Springs Visitor Center, Guadalupe Mountains National Park, Culberson County. SDG 6.6 and 15.1.): 1. 1. From the established path near the Pine Springs Visitor Center, photograph a bare or invasive choked canyon mouth wash segment without leaving the visitor center apron. 2. 2. Note whether the segment shows invasive plant cover, bare eroding soil, or intact native canyon mouth cover. 3. 3. Photograph the Pine Springs Visitor Center building for reference. 4. 4. Record a ranked follow on note naming the segment for the restoration crew. Done when: document only stand off photo log plus segment condition note plus GPS plus ranked follow on note

Where
Pine Springs Visitor Center, 400 Pine Canyon Drive, Salt Flat, TX 79847 (public National Park Service visitor center at the mouth of Pine Springs Canyon)
Pay
$90 proposed

This packet is not funded yet, so this figure is a proposed price and not money waiting in escrow. If a buyer funds it, approved proof settles that price onchain. If nobody funds it, approved proof earns provable credit toward the work instead of cash. You see which before you claim, never after.

Proof
document only stand off photo log plus segment condition note plus GPS plus ranked follow on note

This is exactly what gets it approved. Nothing settles without it.

Level
entry
Open until
2026-10-29

How this work is done

A documented method, so this packet comes out the same whoever does it. Typically 90–180 minutes. Method of record: Urban-creek riparian restoration install (native buffer planting, bank stabilization, invasive/litter removal) per NRCS CPS 391 riparian forest buffer + EPA nonpoint-source BMP practice -- hands-on restoration, not a bioassessment survey; assess->clear->plant/stabilize->verify

Bring

Steps

  1. 1. Walk the reach with the site plan (or the standing bioassessment/watershed-health finding, if one exists) and photograph the bank/buffer segment as found: bare soil, invasive cover, litter, erosion.
  2. 2. Clear invasive growth and litter from the planting zone by hand, bagging trash separately from green waste; leave native volunteers in place.
  3. 3. Plant native riparian species (or set willow stakes / erosion-control matting) at the spacing and depth the site plan calls for, working from the top of bank downward; water each planting in.
  4. 4. Stake or anchor any erosion-control matting so it will not lift in the next high-flow event, and mulch around new plantings kept clear of stems.
  5. 5. Photograph the finished segment from the matching vantage, record species/count or matting area installed, and note any follow-up watering the planting needs.

If it does not match the plan

What counts as done

Proof is measured against these, not judged by taste.

Claim it on the board

Claiming is free. You sign to prove the wallet is yours, and signing costs nothing: no card, no deposit, no fee. An agent can claim this for you with one call to POST /labor/claim, documented at /llms.txt.

Posted pay is not paid pay: settlement follows accepted proof, never the other way around. Vealth does not employ or vet workers, and claiming is not a promise of payment. See how proof and receipts work.