Anyone can start here · public irrigation delivery canal right of way maintained by the local water district, Dell City, TX 79837, Hudspeth County

Document a leaking irrigation canal segment in Dell City, site 2, public irrigation delivery canal right of way maintained by the local water district, Dell City, TX 79837, Hudspeth County (2026-07-30)

This irrigation canal segment along the public water district canal right of way in Dell City shows active seepage or standing tailwater with no photo record to prioritize it for hand conservation work, wasting water drawn from the shared Bolson aquifer. Standard: USDA NRCS irrigation water management tailwater recovery and canal seepage control practice, SDG 6.4 water use efficiency, applied here to the Bolson aquifer fed irrigation district canal system in Dell City, Hudspeth County, far West Texas. Proof: document only stand off photo log plus segment condition note plus GPS plus ranked follow on note Method (USDA NRCS irrigation water management tailwater recovery and canal seepage control practice, SDG 6.4 water use efficiency, applied here to the Bolson aquifer fed irrigation district canal system in Dell City, Hudspeth County, far West Texas.): 1. 1. From the public water district canal right of way in Dell City, photograph a leaking or overflowing canal segment without leaving the canal right of way. 2. 2. Note whether the segment shows active seepage, standing tailwater, or an intact canal bank. 3. 3. Photograph the nearest canal marker or turnout structure for reference. 4. 4. Record a ranked follow on note naming the segment for the tailwater conservation install crew. Done when: document only stand off photo log plus segment condition note plus GPS plus ranked follow on note

Where
public irrigation delivery canal right of way maintained by the local water district, Dell City, TX 79837, Hudspeth County
Pay
$90 proposed

This packet is not funded yet, so this figure is a proposed price and not money waiting in escrow. If a buyer funds it, approved proof settles that price onchain. If nobody funds it, approved proof earns provable credit toward the work instead of cash. You see which before you claim, never after.

Proof
document only stand off photo log plus segment condition note plus GPS plus ranked follow on note

This is exactly what gets it approved. Nothing settles without it.

Level
entry
Open until
2026-10-29

How this work is done

A documented method, so this packet comes out the same whoever does it. Typically 60–120 minutes. Method of record: Mobile Irrigation Lab catch-can distribution-uniformity audit

Bring

Steps

  1. 1. Confirm the site/zone; record GPS; identify the system type (sprinkler / drip / micro).
  2. 2. Sprinkler zones: lay catch cans on a grid across the zone, run the zone a fixed time, and measure the water depth in each can.
  3. 3. Compute distribution uniformity (low-quarter DU) from the catch-can depths.
  4. 4. Drip/micro zones: measure emitter flow at several points (fill a container over a fixed time) and inspect for clogs and leaks.
  5. 5. Read operating pressure at the zone; note leaks, broken/misaligned heads, and overspray onto pavement.
  6. 6. Review the run schedule against plant/soil need (over/under-watering, runoff).
  7. 7. Rank fixes (head repair, pressure regulation, schedule change) by water savings; record DU/emitter flow, pressure, leaks, schedule note, photos; sign.

If it does not match the plan

What counts as done

Proof is measured against these, not judged by taste.

Claim it on the board

Claiming is free. You sign to prove the wallet is yours, and signing costs nothing: no card, no deposit, no fee. An agent can claim this for you with one call to POST /labor/claim, documented at /llms.txt.

Posted pay is not paid pay: settlement follows accepted proof, never the other way around. Vealth does not employ or vet workers, and claiming is not a promise of payment. See how proof and receipts work.