advanced work · a community building in Oakland, CA

Do the building efficiency work at a community building in Oakland, CA

A shared community building in Oakland, CA needs hands-on work to cut its energy, water, air, or material waste. This packet scopes and does that work so the building runs cleaner and cheaper. Standard: Level-2 EV charging installation — NEC Article 625 + local electrical permit, UL-listed EVSE (LBC Energy petal). SDG 7/11. Proof: Load calculation + permit references + Torque log + labeled breaker photo + Electrical inspection pass reference + Charge-session photo/log Reference method for the ev_charger_install standard (Level-2 EV charging equipment installation per NEC Article 625 + local electrical permit (ENERGY STAR / UL listed EVSE) — licensed electrician; assess→install→verify, ~180-480 min): 1. ASSESS: run/verify the service load calculation for the new circuit, confirm panel capacity and the run path, and photograph the panel schedule and install location before work. 2. Install the branch circuit (conduit, conductors, breaker) sized per the EVSE nameplate and NEC 625; torque terminations to spec. 3. Mount and wire the EVSE at the required height/location (clear of the parking envelope, cable management per listing) and label the circuit. 4. Commission: verify voltage, GFCI/CCID function, and a full charge session on a vehicle or tester; register the unit if networked. 5. VERIFY: pass the electrical inspection; photograph the completed installation, breaker, and label; record the charge-session proof and leave the owner the operating info. Equipment: UL-listed Level-2 EVSE + mounting hardware, conductors/conduit, breaker and GFCI protection per NEC 625 plan, multimeter/clamp meter + torque screwdriver (licensed electrician), load calculation worksheet + permit Done when: Load calculation + permit references; Torque log + labeled breaker photo; Electrical inspection pass reference; Charge-session photo/log

Where
a community building in Oakland, CA
Pay
$800 proposed

This packet is not funded yet, so this figure is a proposed price and not money waiting in escrow. If a buyer funds it, approved proof settles that price onchain. If nobody funds it, approved proof earns provable credit toward the work instead of cash. You see which before you claim, never after.

Proof
Load calculation + permit references + Torque log + labeled breaker photo + Electrical inspection pass reference + Charge-session photo/log

This is exactly what gets it approved. Nothing settles without it.

Level
advanced
Open until
2026-09-14

How this work is done

A documented method, so this packet comes out the same whoever does it. Typically 180–480 minutes. Method of record: Level-2 EV charging equipment installation per NEC Article 625 + local electrical permit (ENERGY STAR / UL listed EVSE) — licensed electrician; assess→install→verify

Bring

Steps

  1. 1. ASSESS: run/verify the service load calculation for the new circuit, confirm panel capacity and the run path, and photograph the panel schedule and install location before work.
  2. 2. Install the branch circuit (conduit, conductors, breaker) sized per the EVSE nameplate and NEC 625; torque terminations to spec.
  3. 3. Mount and wire the EVSE at the required height/location (clear of the parking envelope, cable management per listing) and label the circuit.
  4. 4. Commission: verify voltage, GFCI/CCID function, and a full charge session on a vehicle or tester; register the unit if networked.
  5. 5. VERIFY: pass the electrical inspection; photograph the completed installation, breaker, and label; record the charge-session proof and leave the owner the operating info.

If it does not match the plan

What counts as done

Proof is measured against these, not judged by taste.

Claim it on the board

Claiming is free. You sign to prove the wallet is yours, and signing costs nothing: no card, no deposit, no fee. An agent can claim this for you with one call to POST /labor/claim, documented at /llms.txt.

Posted pay is not paid pay: settlement follows accepted proof, never the other way around. Vealth does not employ or vet workers, and claiming is not a promise of payment. See how proof and receipts work.