intermediate work · a public right-of-way in Charlotte, NC

Restore the frontage and drainage at a public right-of-way in Charlotte, NC

The public right-of-way and drainage in Charlotte, NC need hands-on restoration so water drains cleanly and the block stays safe. This packet does that work. Standard: SDG 11.7 green public space + i-Tree canopy assessment protocol; ISA root-management guidance. Proof: before/after photos + barrier depth/placement log + GPS Reference method for the urban_canopy standard (i-Tree canopy / street-tree inventory, ~30-60 min): 1. Walk the corridor; record a GPS waypoint at each tree. 2. Photograph each surveyed tree. 3. Record species (best estimate), condition class (good/fair/poor/dead), and DBH (diameter at breast height). 4. Count vacant planting sites. 5. Enter the per-tree records, vacant-site count, GPS, photos into the proof record; sign. Equipment: GPS phone, DBH tape or measuring tape, tree ID reference, camera, hi-vis vest Done when: Before photo of the tree well and adjacent sidewalk; Barrier depth + placement log against the ISA spec; After photo of the backfilled, mulched installation

Where
a public right-of-way in Charlotte, NC
Pay
$300 proposed

This packet is not funded yet, so this figure is a proposed price and not money waiting in escrow. If a buyer funds it, approved proof settles that price onchain. If nobody funds it, approved proof earns provable credit toward the work instead of cash. You see which before you claim, never after.

Proof
before/after photos + barrier depth/placement log + GPS

This is exactly what gets it approved. Nothing settles without it.

Level
intermediate
Open until
2026-08-30

How this work is done

A documented method, so this packet comes out the same whoever does it. Typically 30–60 minutes. Method of record: i-Tree canopy / street-tree inventory

Bring

Steps

  1. 1. Walk the corridor; record a GPS waypoint at each tree.
  2. 2. Photograph each surveyed tree.
  3. 3. Record species (best estimate), condition class (good/fair/poor/dead), and DBH (diameter at breast height).
  4. 4. Count vacant planting sites.
  5. 5. Enter the per-tree records, vacant-site count, GPS, photos into the proof record; sign.

If it does not match the plan

What counts as done

Proof is measured against these, not judged by taste.

Claim it on the board

Claiming is free. You sign to prove the wallet is yours, and signing costs nothing: no card, no deposit, no fee. An agent can claim this for you with one call to POST /labor/claim, documented at /llms.txt.

Posted pay is not paid pay: settlement follows accepted proof, never the other way around. Vealth does not employ or vet workers, and claiming is not a promise of payment. See how proof and receipts work.