Anyone can start here · a public right-of-way in Houston, TX

Restore the frontage and drainage at a public right-of-way in Houston, TX

The public right-of-way and drainage in Houston, TX need hands-on restoration so water drains cleanly and the block stays safe. This packet does that work. Standard: FEMA floodplain + green-infrastructure siting screen; SDG 11.5 disaster resilience. Proof: photo + GPS + low-spot/drainage map + siting note Reference method for the flood_resilience standard (FEMA floodplain + green-infrastructure siting screen, ~45-90 min): 1. Confirm post-event conditions are safe; navigate to the site; record GPS. 2. Photograph deposited sediment / affected area. 3. Measure deposition depth at representative points. 4. If a sediment contaminant screen is in scope, run the metals field kit and record values. 5. Note debris, hazards, and the extent (sketch). 6. Enter depth, any analytes, hazard notes, GPS, photos into the proof record; sign. Equipment: GPS phone, tape/ruler for deposition depth, metals field kit (if sediment screen in scope), boots + gloves, camera Done when: Photos of drainage points and low spots on campus grounds; GPS waypoints; Low-spot/ponding locations mapped from a known past flood line

Where
a public right-of-way in Houston, TX
Pay
$220 proposed

This packet is not funded yet, so this figure is a proposed price and not money waiting in escrow. If a buyer funds it, approved proof settles that price onchain. If nobody funds it, approved proof earns provable credit toward the work instead of cash. You see which before you claim, never after.

Proof
photo + GPS + low-spot/drainage map + siting note

This is exactly what gets it approved. Nothing settles without it.

Level
entry
Open until
2026-09-14

How this work is done

A documented method, so this packet comes out the same whoever does it. Typically 45–90 minutes. Method of record: FEMA floodplain + green-infrastructure siting screen

Bring

Steps

  1. 1. Confirm post-event conditions are safe; navigate to the site; record GPS.
  2. 2. Photograph deposited sediment / affected area.
  3. 3. Measure deposition depth at representative points.
  4. 4. If a sediment contaminant screen is in scope, run the metals field kit and record values.
  5. 5. Note debris, hazards, and the extent (sketch).
  6. 6. Enter depth, any analytes, hazard notes, GPS, photos into the proof record; sign.

If it does not match the plan

What counts as done

Proof is measured against these, not judged by taste.

Claim it on the board

Claiming is free. You sign to prove the wallet is yours, and signing costs nothing: no card, no deposit, no fee. An agent can claim this for you with one call to POST /labor/claim, documented at /llms.txt.

Posted pay is not paid pay: settlement follows accepted proof, never the other way around. Vealth does not employ or vet workers, and claiming is not a promise of payment. See how proof and receipts work.