Elementary schoolyard low corner, Live Oak, CA 95953
Build a rain garden.
The same Live Oak schoolyard that needs shade also has a low corner that ponds after every winter storm, turning to standing Read all of it
Not funded yet. Settles as earned credit, $220 proposed.
Proof it takes, the deadline, the level
- ProofPhoto of finished rain garden with plantings
- Open until2026-10-30
- Levelentry
All of it: the words, the place, the proof
The same Live Oak schoolyard that needs shade also has a low corner that ponds after every winter storm, turning to standing water that keeps kids off the field for days. A shallow rain garden planted with natives soaks that water in instead of letting it sit.
Fund it for $220. Proof lands onchain when it's done.
How this work is done
How this work is done
A documented method, so this packet comes out the same whoever does it.
Steps
- Confirm the low corner location with school facilities staff.
- Dig a shallow basin roughly 6 inches deep, sloped toward the low point.
- Line the basin edge with mulch or river rock to slow incoming flow.
- Plant native, water-tolerant grasses and perennials in the basin.
- Water the new plantings in thoroughly.
- Photograph the finished rain garden from two angles.
What counts as done
- Photo of dug basin
- Photo of planted rain garden
- School facilities sign-off
Proof is measured against these, not judged by taste.
The standard this serves
Green Stormwater Infrastructure. Green stormwater infrastructure is the city's way of handling rain the way a meadow does: rain gardens, planted swales, and permeable pavement that let a storm soak in instead of surging down a pipe. The EPA's inspection standard keeps these systems honest, because a neglected rain garden quietly stops working while still looking like a garden. Mastery is the inspector's eye: reading inlets, overflow, plants, and soil in a single practiced pass. This packet is one such inspection, one basin checked and one record filed, which is precisely how a thousand basins stay alive.
What is promised, and what is not
Three separate acts, never one: a vote is a free signed preference that moves no money; a pledge is free signed backing intent, balance-checked, that moves no money and never marks the packet funded; funding is a real payment that backs the wage. Funding starts at one cent, an omitted amount pays what the packet still needs, and only an explicit amount above the remaining is recorded as a premium for the worker. Money settles only on accepted proof. An agent can fund it in one x402 call: POST /nurture/fund {"workId":"WORK_1785462732772_xwixp6k","funderWallet":"0xYOU"}.
Open, but not claimable yet. restricted: permit-required — Regulated or permit-required work cannot be claimed on this rail yet. It stays readable; voting and pledging are free, and funding is separate from claiming.
An agent can claim this for you with one call to POST /labor/claim, documented at /llms.txt.
Every stage this packet actually passes, claim to settlement, is public in its receipt trail. A stage that has not happened is not claimed.
Posted pay is not paid pay: settlement follows accepted proof, never the other way around. Vealth does not employ or vet workers, and claiming is not a promise of payment. See how proof and receipts work.
Other acts: vote, pledge, fund
Packet WORK_1785462732772_xwixp6k