Anyone can start here · a public right-of-way in Berry Creek, CA

Clear and document the debris at a public right-of-way in Berry Creek, CA

Debris on the grounds in Berry Creek, CA is a hazard and an eyesore. This documents and clears it safely. Standard: CalRecycle/Cal OES Consolidated Debris Removal Program post-wildfire parcel-status documentation + hazmat-trained ash/structure-debris hauling practice; SDG 11.b/12.4 sound chemicals-and-waste management. Proof: document-only photo set from the public road/lot edge + GPS waypoint + status tag + ranked follow-on list Reference method for the civic_safety standard (Community-coordination hazard survey (documentation + coordination only; severity-tagged), ~30-60 min): 1. Walk the corridor from a safe path; record a GPS waypoint at each hazard. 2. Photograph each hazard. 3. Classify the hazard type and assign a severity tag (minor|moderate|severe|critical). 4. Name the responsible handoff target (BID / city agency / utility). 5. Enter each hazard's type, severity, GPS, photo, and handoff target into the proof record; sign. Equipment: GPS phone, camera, hi-vis vest, severity-tag reference (minor|moderate|severe|critical) Done when: Photo of the visible debris/foundation area taken from the public road or lot edge; GPS waypoint; Status tag (cleared|partial debris remaining|ash/foundation debris visible|hazard tree standing); Ranked list naming the follow-on licensed-crew removal job

Where
a public right-of-way in Berry Creek, CA
Pay
$90 proposed

This packet is not funded yet, so this figure is a proposed price and not money waiting in escrow. If a buyer funds it, approved proof settles that price onchain. If nobody funds it, approved proof earns provable credit toward the work instead of cash. You see which before you claim, never after.

Proof
document-only photo set from the public road/lot edge + GPS waypoint + status tag + ranked follow-on list

This is exactly what gets it approved. Nothing settles without it.

Level
entry
Open until
2026-09-14

How this work is done

A documented method, so this packet comes out the same whoever does it. Typically 30–60 minutes. Method of record: Community-coordination hazard survey (documentation + coordination only; severity-tagged)

Bring

Steps

  1. 1. Walk the corridor from a safe path; record a GPS waypoint at each hazard.
  2. 2. Photograph each hazard.
  3. 3. Classify the hazard type and assign a severity tag (minor|moderate|severe|critical).
  4. 4. Name the responsible handoff target (BID / city agency / utility).
  5. 5. Enter each hazard's type, severity, GPS, photo, and handoff target into the proof record; sign.

If it does not match the plan

What counts as done

Proof is measured against these, not judged by taste.

Claim it on the board

Claiming is free. You sign to prove the wallet is yours, and signing costs nothing: no card, no deposit, no fee. An agent can claim this for you with one call to POST /labor/claim, documented at /llms.txt.

Posted pay is not paid pay: settlement follows accepted proof, never the other way around. Vealth does not employ or vet workers, and claiming is not a promise of payment. See how proof and receipts work.