Anyone can start here · the public school campus in Coleman, TX 76834, Coleman County (public school district campus)
Install a keep it clean, drains downstream stencil at a Coleman school campus inlet, inlet 2, the public school campus in Coleman, TX 76834, Coleman County (public school district campus)
The drainage inlets near the public school campus in Coleman carry no marking telling anyone that whatever goes in the gutter reaches the shared upper Colorado River headwaters watershed downstream, a durable stenciled warning is the cheapest upstream prevention there is. Standard: EPA green infrastructure inspection and stencil marking practice, applied here to a public right of way in Coleman, TX, Coleman County. SDG 6.3 and 6.6. Proof: before after photos plus stencil legibility check plus paint product durability spec plus GPS Reference method for the green_stormwater_infrastructure standard (EPA green-infrastructure inspection (bioretention / bioswale / permeable pavement function + maintenance), ~30-75 min): 1. Locate the GI asset; record GPS; identify the type (rain garden / bioswale / permeable pavement / tree filter). 2. Photograph the asset, its inlet, and its outlet/overflow. 3. Check the inlet and outlet for blockage (sediment, trash, mulch) and note whether flow can enter/leave freely. 4. Check for standing water and estimate whether it drains within the design window (typically <24-48h after rain); probe media if dry. 5. Assess vegetation/media condition and estimate sediment/trash accumulation depth. 6. Note erosion, bypass, or structural damage and list the maintenance needed. 7. Enter asset type, condition, inlet/outlet status, drainage observation, sediment level, maintenance needs, GPS, photos; sign. Equipment: measuring tape, GPS phone, camera, trowel / probe, data sheet, gloves Done when: Before photo of the bare, unmarked drainage inlet; Durable, low VOC pavement marking paint spec sheet matched to the applied product; After photo of the fully legible stencil at the inlet; Cure time confirmation before the surface is walked on
How this work is done
A documented method, so this packet comes out the same whoever does it. Typically 30–75 minutes. Method of record: EPA green-infrastructure inspection (bioretention / bioswale / permeable pavement function + maintenance)
Bring
- measuring tape
- GPS phone
- camera
- trowel / probe
- data sheet
- gloves
Steps
- 1. Locate the GI asset; record GPS; identify the type (rain garden / bioswale / permeable pavement / tree filter).
- 2. Photograph the asset, its inlet, and its outlet/overflow.
- 3. Check the inlet and outlet for blockage (sediment, trash, mulch) and note whether flow can enter/leave freely.
- 4. Check for standing water and estimate whether it drains within the design window (typically <24-48h after rain); probe media if dry.
- 5. Assess vegetation/media condition and estimate sediment/trash accumulation depth.
- 6. Note erosion, bypass, or structural damage and list the maintenance needed.
- 7. Enter asset type, condition, inlet/outlet status, drainage observation, sediment level, maintenance needs, GPS, photos; sign.
If it does not match the plan
- Standing water persists > 48h after rain -> flag failed infiltration (clogged media) for rehab.
- Inlet or outlet blocked -> flag for cleaning; the asset isn't capturing runoff.
- Erosion, undercutting, or flow bypassing the asset -> flag for repair.
- Documentation only — no digging out media or altering structures.
What counts as done
- Asset type + overall condition recorded
- Inlet + outlet clear/blocked status recorded
- Standing-water / infiltration observation recorded
- Sediment/trash level + maintenance recommendations + GPS + photos
Proof is measured against these, not judged by taste.
Claiming is free. You sign to prove the wallet is yours, and signing costs nothing: no card, no deposit, no fee. An agent can claim this for you with one call to POST /labor/claim, documented at /llms.txt.
Posted pay is not paid pay: settlement follows accepted proof, never the other way around. Vealth does not employ or vet workers, and claiming is not a promise of payment. See how proof and receipts work.