Anyone can start here · the public school campus in Waxahachie, TX 75165, Ellis County (public school district campus)

Install a keep it clean, drains downstream stencil at a Waxahachie school campus inlet, inlet 2, the public school campus in Waxahachie, TX 75165, Ellis County (public school district campus)

Install a keep it clean, drains downstream stencil at a Waxahachie school campus…. Fund it for $180. Proof lands on-chain when it's done.

The drainage inlets near the public school campus in Waxahachie carry no marking telling anyone that whatever goes in the gutter reaches the shared Chambers Creek watershed downstream, a durable stenciled warning is the cheapest upstream prevention there is. Standard: EPA green infrastructure inspection and stencil marking practice, applied here to a public right of way in Waxahachie, TX, Ellis County. SDG 6.3 and 6.6. Proof: before after photos plus stencil legibility check plus paint product durability spec plus GPS Reference method for the green_stormwater_infrastructure standard (EPA green-infrastructure inspection (bioretention / bioswale / permeable pavement function + maintenance), ~30-75 min): 1. Locate the GI asset; record GPS; identify the type (rain garden / bioswale / permeable pavement / tree filter). 2. Photograph the asset, its inlet, and its outlet/overflow. 3. Check the inlet and outlet for blockage (sediment, trash, mulch) and note whether flow can enter/leave freely. 4. Check for standing water and estimate whether it drains within the design window (typically <24-48h after rain); probe media if dry. 5. Assess vegetation/media condition and estimate sediment/trash accumulation depth. 6. Note erosion, bypass, or structural damage and list the maintenance needed. 7. Enter asset type, condition, inlet/outlet status, drainage observation, sediment level, maintenance needs, GPS, photos; sign. Equipment: measuring tape, GPS phone, camera, trowel / probe, data sheet, gloves Done when: Before photo of the bare, unmarked drainage inlet; Durable, low VOC pavement marking paint spec sheet matched to the applied product; After photo of the fully legible stencil at the inlet; Cure time confirmation before the surface is walked on

Where
the public school campus in Waxahachie, TX 75165, Ellis County (public school district campus)
Pay
$180 proposed

This packet is not funded yet, so this figure is a proposed price and not money waiting in escrow. If a buyer funds it, approved proof settles that price onchain. If nobody funds it, approved proof earns provable credit toward the work instead of cash. You see which before you claim, never after.

Proof
before after photos plus stencil legibility check plus paint product durability spec plus GPS

This is exactly what gets it approved. Nothing settles without it.

Level
entry
Open until
2026-08-30

How this work is done

A documented method, so this packet comes out the same whoever does it. Typically 30–75 minutes. Method of record: EPA green-infrastructure inspection (bioretention / bioswale / permeable pavement function + maintenance)

Bring

Steps

  1. 1. Locate the GI asset; record GPS; identify the type (rain garden / bioswale / permeable pavement / tree filter).
  2. 2. Photograph the asset, its inlet, and its outlet/overflow.
  3. 3. Check the inlet and outlet for blockage (sediment, trash, mulch) and note whether flow can enter/leave freely.
  4. 4. Check for standing water and estimate whether it drains within the design window (typically <24-48h after rain); probe media if dry.
  5. 5. Assess vegetation/media condition and estimate sediment/trash accumulation depth.
  6. 6. Note erosion, bypass, or structural damage and list the maintenance needed.
  7. 7. Enter asset type, condition, inlet/outlet status, drainage observation, sediment level, maintenance needs, GPS, photos; sign.

If it does not match the plan

What counts as done

Proof is measured against these, not judged by taste.

The standard this serves

Green Stormwater Infrastructure. Green stormwater infrastructure is the city's way of handling rain the way a meadow does: rain gardens, planted swales, and permeable pavement that let a storm soak in instead of surging down a pipe. The EPA's inspection standard keeps these systems honest, because a neglected rain garden quietly stops working while still looking like a garden. Mastery is the inspector's eye: reading inlets, overflow, plants, and soil in a single practiced pass. This packet is one such inspection, one basin checked and one record filed, which is precisely how a thousand basins stay alive.

Claim it on the board Fund this work · $180

Funding this work is a purchase or a vote, same act: you either want this done here, or you want the world to contain it. Either way the money settles only on accepted proof. An agent can fund it in one x402 call: POST /nurture/fund {"workId":"WORK_1785499577708_jvt4ln3","funderWallet":"0xYOU"}.

Claiming is free. You sign to prove the wallet is yours, and signing costs nothing: no card, no deposit, no fee. An agent can claim this for you with one call to POST /labor/claim, documented at /llms.txt.

Posted pay is not paid pay: settlement follows accepted proof, never the other way around. Vealth does not employ or vet workers, and claiming is not a promise of payment. See how proof and receipts work.