Anyone can start here · Caddo Lake State Park (Texas Parks and Wildlife Department, public state park), 245 Park Rd 2, Karnack, TX 75661, Harrison County

Document bald cypress seedling regeneration in the Caddo Lake swamp, site 1, Caddo Lake State Park (Texas Parks and Wildlife Department, public state park), 245 Park Rd 2, Karnack, TX 75661, Harrison County (2026-08-04)

Document bald cypress seedling regeneration in the Caddo Lake swamp, site 1, Caddo…. Fund it for $85. Proof lands on-chain when it's done.

A section of the Caddo Lake bald cypress swamp visible from the state park boardwalk shows thin natural seedling regeneration with no photo record to prioritize it for the seasonal drawdown planting crew. Standard: US Fish and Wildlife Service and Texas Parks and Wildlife Department bald-cypress (Taxodium distichum) swamp regeneration guidance (seasonal drawdown germination window) plus USDA NRCS conservation practice standard 612 tree/shrub establishment, applied here to the Caddo Lake bald-cypress swamp inside Caddo Lake State Park, Karnack, TX, Harrison County, a Ramsar Wetland of International Importance. SDG 15.1 and 15.5. Proof: document only observation log plus seedling density note plus GPS plus ranked follow on note Method (US Fish and Wildlife Service and Texas Parks and Wildlife Department bald-cypress (Taxodium distichum) swamp regeneration guidance (seasonal drawdown germination window) plus USDA NRCS conservation practice standard 612 tree/shrub establishment, applied here to the Caddo Lake bald-cypress swamp inside Caddo Lake State Park, Karnack, TX, Harrison County, a Ramsar Wetland of International Importance. SDG 15.1 and 15.5.): 1. 1. From the park's designated boardwalk or a shoreline overlook at Caddo Lake State Park, photograph a section of the bald cypress swamp, never leaving the boardwalk or stepping into swamp water. 2. 2. Note the approximate density of natural cypress seedling regeneration visible from the boardwalk, and whether browse damage or standing water appears to be limiting establishment. 3. 3. Note whether the current water level appears low enough (seasonal drawdown) to expose substrate for germination, and photograph from a fixed reference point for future comparison. 4. 4. Record a ranked follow on note naming the segment for the credentialed cypress seedling planting crew. Done when: Photo of the cypress swamp section taken from the designated boardwalk or overlook; Note of the approximate natural seedling density and any limiting factor observed (browse, standing water); Confirmation the boardwalk was never left and swamp water was never entered during the survey; Ranked follow on note naming the segment for the credentialed planting crew; GPS waypoint of the surveyed segment

Where
Caddo Lake State Park (Texas Parks and Wildlife Department, public state park), 245 Park Rd 2, Karnack, TX 75661, Harrison County
Pay
$85 proposed

This packet is not funded yet, so this figure is a proposed price and not money waiting in escrow. If a buyer funds it, approved proof settles that price onchain. If nobody funds it, approved proof earns provable credit toward the work instead of cash. You see which before you claim, never after.

Proof
document only observation log plus seedling density note plus GPS plus ranked follow on note

This is exactly what gets it approved. Nothing settles without it.

Level
entry
Open until
2026-11-03

How this work is done

A documented method, so this packet comes out the same whoever does it. Typically 45–120 minutes. Method of record: Point-count / transect species survey (Breeding Bird Survey + Xerces pollinator-count protocols)

Bring

Steps

  1. 1. Navigate to the first survey point; record GPS; note start time, weather, and wind (surveys pause in rain/high wind).
  2. 2. Wait a settling minute, then run a fixed-duration count (e.g., 5 min) within a fixed radius; record every species seen/heard and the count of each.
  3. 3. Photograph the habitat and any species you can; note any threatened/target or invasive species.
  4. 4. Move to the next point along the transect (keep points >=200 m apart) and repeat the count.
  5. 5. Record total effort (points, duration) and observer.
  6. 6. Enter the per-point species lists + counts, GPS, weather, effort, and photos into the proof record; sign.

If it does not match the plan

What counts as done

Proof is measured against these, not judged by taste.

Claim it on the board Fund this work · $85

Funding this work is a purchase or a vote, same act: you either want this done here, or you want the world to contain it. Either way the money settles only on accepted proof. An agent can fund it in one x402 call: POST /nurture/fund {"workId":"WORK_1785874376480_d1120go","funderWallet":"0xYOU"}.

Claiming is free. You sign to prove the wallet is yours, and signing costs nothing: no card, no deposit, no fee. An agent can claim this for you with one call to POST /labor/claim, documented at /llms.txt.

Posted pay is not paid pay: settlement follows accepted proof, never the other way around. Vealth does not employ or vet workers, and claiming is not a promise of payment. See how proof and receipts work.