intermediate work · resident homes in Monahans, TX 79756, Ward County (own home)
Service the evaporative cooler pad at a resident's own home, home 2, resident homes in Monahans, TX 79756, Ward County (own home)
Service the evaporative cooler pad at a resident's own home, home 2, resident homes…. Fund it for $95. Proof lands on-chain when it's done.
The survey above found a saturated or mineral scaled evaporative cooler pad at a resident's own home, and a hand serviced pad replacement would otherwise leave this household with reduced cooling against extreme West Texas summer heat. Standard: US DOE Weatherization Assistance Program DIY safe maintenance measures plus ENERGY STAR Home Upgrade guidance, LBC Energy petal, applied here to evaporative cooling units on older housing stock in Monahans and Kermit, TX, against extreme West Texas summer heat load. Proof: resident permission record plus unplug confirm plus before after photos plus pad material and count record plus GPS Method (US DOE Weatherization Assistance Program DIY safe maintenance measures plus ENERGY STAR Home Upgrade guidance, LBC Energy petal, applied here to evaporative cooling units on older housing stock in Monahans and Kermit, TX, against extreme West Texas summer heat load.): 1. 1. Confirm the unit with the resident and unplug the cooler at the cord or breaker first, before touching any part of the unit. 2. 2. Remove the saturated or mineral scaled cooler pad media by hand and set it aside for disposal. 3. 3. Clean the reservoir and float valve by hand, then install the new cooler pad media in the housing. 4. 4. Plug the unit back in, run it briefly to test airflow and water distribution, and photograph the serviced unit, recording the pad material and count replaced. Done when: Written or recorded permission from the resident; Confirmation the unit was unplugged at the cord or breaker before service began; Before photo of the saturated or mineral scaled pad; Pad material and count replaced recorded; After photo of the serviced unit with airflow test confirmed
How this work is done
A documented method, so this packet comes out the same whoever does it. Typically 75–150 minutes. Method of record: Weatherization readiness survey (DOE WAP field practice + ENERGY STAR Home Upgrade; BPI combustion-safety-first sequencing; LBC Energy petal; observation/planning only)
Bring
- camera
- tape measure + flashlight (attic/crawl/basement/rim joist)
- low-cost CO monitor (spot screening at combustion appliances)
- incense stick or smoke pencil (qualitative draft tracing, no blower door)
- tablet/clipboard with the weatherization-readiness checklist
- thermal/IR camera (optional, insulation-gap scope)
Steps
- 1. Confirm scope with the household and record what they actually feel: the cold rooms, the drafts, the winter bill they want lower. Their comfort targets frame the package: this is their claim of a warmer home, not a generic energy audit.
- 2. Inventory the envelope by assembly with photos: attic insulation presence + approximate depth/R-level, accessible wall/floor/rim-joist insulation, window/door condition and weatherstripping, and visible bypasses (top plates, chases, recessed lights, attic hatch).
- 3. Trace drafts qualitatively (smoke pencil/incense at suspect points on a breezy day or with exhaust fans running) and rank the air-sealing targets; note that quantitative blower-door verification belongs to the weatherization contractor.
- 4. Screen combustion safety BEFORE tightening is planned: photograph each combustion appliance + venting, take a CO spot reading, and flag anything (orphaned water heater, corroded flue, suspected backdrafting) that a BPI-qualified pro must clear before ANY air-sealing proceeds.
- 5. Check moisture prerequisites: any active leak, bulk-water entry, or damp assembly gets sequenced ahead of insulation (never insulate a wet assembly), and note ventilation needs after tightening (bath/kitchen exhaust, fresh-air strategy).
- 6. Assemble the weatherization-readiness package: ranked air-sealing targets, insulation gaps by assembly with rough quantities, combustion-safety flags that gate the work, moisture prerequisites, ventilation-after-tightening notes, and the utility/WAP program paths the household may qualify for.
- 7. Enter photos, GPS/address, the assembly inventory, CO readings, and the readiness package; sign. Route combustion clearance to a BPI-qualified pro and installation to insured insulation contractors, the survey scopes, it never installs.
If it does not match the plan
- CO spot reading >9 ppm, an orphaned/corroded flue, or suspected backdrafting -> the package is GATED: no air-sealing or insulation item proceeds until a BPI-qualified pro clears combustion safety; route immediately.
- Active leak, bulk-water entry, or a damp/wet assembly -> sequence moisture control FIRST; never scope insulation over a wet assembly.
- Vermiculite or suspect asbestos insulation in the attic, or pre-1978 deteriorated paint at work surfaces -> do not disturb; mark affected items licensed-abatement / EPA-RRP-only.
- Knob-and-tube or exposed/scorched wiring in an assembly slated for insulation -> flag stop-work on insulating that assembly; a licensed electrician clears it first.
What counts as done
- Written or recorded permission from the resident
- Confirmation the unit was unplugged at the cord or breaker before service began
- Before photo of the saturated or mineral scaled pad
- Pad material and count replaced recorded
- After photo of the serviced unit with airflow test confirmed
Proof is measured against these, not judged by taste.
The standard this serves
Weatherization Readiness. Weatherization readiness is the survey that turns a cold, expensive-to-heat home into a fundable plan. Following the Department of Energy's program, the surveyor maps where the house leaks air, which attics and walls lack insulation, what fresh-air path must follow the tightening, and which safety checks must clear first. Mastery looks like a walkthrough that ends with a package a weatherization crew can price without a second visit. This packet is one piece of one such survey, done carefully and written down, so a real family's real house gets closer to warm.
Funding this work is a purchase or a vote, same act: you either want this done here, or you want the world to contain it. Either way the money settles only on accepted proof. An agent can fund it in one x402 call: POST /nurture/fund {"workId":"WORK_1785877698045_ovyi225","funderWallet":"0xYOU"}.
Claiming is free. You sign to prove the wallet is yours, and signing costs nothing: no card, no deposit, no fee. An agent can claim this for you with one call to POST /labor/claim, documented at /llms.txt.
Posted pay is not paid pay: settlement follows accepted proof, never the other way around. Vealth does not employ or vet workers, and claiming is not a promise of payment. See how proof and receipts work.