Anyone can start here · the public streets and grounds around Bailey County Courthouse, 300 South 1st Street, Muleshoe, TX 79347
Document a broken sidewalk segment, site 3, the public streets and grounds around Bailey County Courthouse, 300 South 1st Street, Muleshoe, TX 79347
Fund it for $85. Proof lands onchain when it's done.
A sidewalk segment near Bailey County Courthouse is missing, badly cracked, or heaved, and no photo record exists to prioritize it for repair.
How this work is done
A documented method, so this packet comes out the same whoever does it. Typically 240–600 minutes. Method of record: Sidewalk panel repair with permeable finish per ADA/PROWAG surface requirements + EPA permeable pavement BMP, under municipal right-of-way permit, trained crew with wet-cut dust controls; assess→repair→verify
Bring
- right-of-way permit + traffic cones/barricades and signage
- wet-cut saw or grinder with water feed + vacuum (dust control), or paver lift/reset tools
- permeable paving material (permeable pavers/pervious mix) + bedding aggregate + compactor
- 2-ft level / smart level + measuring wheel + camera
Steps
- 1. ASSESS: measure and photograph each displaced/cracked panel (lift height, cross-slope, ponding), mark the repair extent, and confirm the right-of-way permit and utility locates (811) before any cutting.
- 2. Set up cones/barricades and a safe pedestrian detour; keep all work out of the traffic lane.
- 3. Remove or wet-cut the failed section with water-fed dust controls; excavate to the design subbase and correct the root or subgrade cause (root-prune only per the city arborist standard).
- 4. Place open-graded base and the permeable surface (pavers or pervious mix) to ADA/PROWAG slope and lippage limits; compact and edge.
- 5. VERIFY: check cross-slope ≤2% and vertical discontinuity ≤1/4 inch, water-test infiltration, photograph before/after from the same vantage, and close out the permit.
If it does not match the plan
- No utility locate (811) or no right-of-way permit -> STOP: do not cut.
- Any cutting/grinding without water-fed dust control -> STOP (respirable silica); wet methods or vacuum shroud are mandatory.
- Structural failure larger than a panel (undermining, sinkhole) -> document and route to the city engineer; do not patch over.
What counts as done
- Photo of the damaged or missing segment taken from a stable stance
- Gap or displacement measurement with a tape measure visible in frame
- Note of the hazard type (trip lip, missing panel, blocked ADA path)
- Ranked follow on note naming the segment for the city sidewalk repair crew
Proof is measured against these, not judged by taste.
Funding this work is a purchase or a vote, same act: you either want this done here, or you want the world to contain it. A vote is free and signed; funding starts at one cent and anything beyond the wage is recorded as a premium for the worker. Either way the money settles only on accepted proof. An agent can fund it in one x402 call: POST /nurture/fund {"workId":"WORK_1785925218187_a2pwnab","funderWallet":"0xYOU"}.
Claiming is free. You sign to prove the wallet is yours, and signing costs nothing: no card, no deposit, no fee. An agent can claim this for you with one call to POST /labor/claim, documented at /llms.txt.
Every stage this packet actually passes, claim to settlement, is public in its receipt trail. A stage that has not happened is not claimed.
Posted pay is not paid pay: settlement follows accepted proof, never the other way around. Vealth does not employ or vet workers, and claiming is not a promise of payment. See how proof and receipts work.