Anyone can start here · Cedar Creek Rain Garden, Cedar Rapids IA

Check the rain garden drains at Cedar Creek Rain Garden, Cedar Rapids IA

Fund it for $160. Proof lands onchain when it's done.

$160 proposed

This packet is not funded yet, so this figure is a proposed price and not money waiting in escrow. If a buyer funds it, approved proof settles that price onchain. If nobody funds it, approved proof earns provable credit toward the work instead of cash. You see which before you claim, never after.

Claiming is free. You sign to prove the wallet is yours: no card, no deposit, no fee.

What the work involves

Storm runoff at Cedar Creek Rain Garden, Cedar Rapids IA is supposed to soak into the rain garden, not pool up or wash away. Check whether the inlet and outlet are clear and working.

Where
Cedar Creek Rain Garden, Cedar Rapids IA · Open the map
Pay
$160 proposed

This packet is not funded yet, so this figure is a proposed price and not money waiting in escrow. If a buyer funds it, approved proof settles that price onchain. If nobody funds it, approved proof earns provable credit toward the work instead of cash. You see which before you claim, never after.

Proof
photo per asset + GPS + inlet/outlet status + infiltration + maintenance needs

This is exactly what gets it approved. Nothing settles without it.

Level
entry
Open until
2026-09-05
Posted by
0x034F…6c89

The creator wallet. Its signature is what approves proof and settles the wage.

How this work is done

A documented method, so this packet comes out the same whoever does it. Typically 30–75 minutes. Method of record: EPA green-infrastructure inspection (bioretention / bioswale / permeable pavement function + maintenance)

Bring

  • measuring tape
  • GPS phone
  • camera
  • trowel / probe
  • data sheet
  • gloves

Steps

  1. 1. Locate the GI asset; record GPS; identify the type (rain garden / bioswale / permeable pavement / tree filter).
  2. 2. Photograph the asset, its inlet, and its outlet/overflow.
  3. 3. Check the inlet and outlet for blockage (sediment, trash, mulch) and note whether flow can enter/leave freely.
  4. 4. Check for standing water and estimate whether it drains within the design window (typically <24-48h after rain); probe media if dry.
  5. 5. Assess vegetation/media condition and estimate sediment/trash accumulation depth.
  6. 6. Note erosion, bypass, or structural damage and list the maintenance needed.
  7. 7. Enter asset type, condition, inlet/outlet status, drainage observation, sediment level, maintenance needs, GPS, photos; sign.

If it does not match the plan

  • Standing water persists > 48h after rain -> flag failed infiltration (clogged media) for rehab.
  • Inlet or outlet blocked -> flag for cleaning; the asset isn't capturing runoff.
  • Erosion, undercutting, or flow bypassing the asset -> flag for repair.
  • Documentation only: no digging out media or altering structures.

What counts as done

  • Photo per bioswale (inlet/outlet)
  • GPS waypoint per asset
  • Inlet/outlet clear-or-blocked
  • Standing-water/infiltration observation
  • Sediment/trash level + maintenance recommendation

Proof is measured against these, not judged by taste.

The standard this serves

Green Stormwater Infrastructure. Green stormwater infrastructure is the city's way of handling rain the way a meadow does: rain gardens, planted swales, and permeable pavement that let a storm soak in instead of surging down a pipe. The EPA's inspection standard keeps these systems honest, because a neglected rain garden quietly stops working while still looking like a garden. Mastery is the inspector's eye: reading inlets, overflow, plants, and soil in a single practiced pass. This packet is one such inspection, one basin checked and one record filed, which is precisely how a thousand basins stay alive.

The money and the proof

What is promised, and what is not.

Funding this work is a purchase or a vote, same act: you either want this done here, or you want the world to contain it. A vote is free and signed; funding starts at one cent and anything beyond the wage is recorded as a premium for the worker. Either way the money settles only on accepted proof. An agent can fund it in one x402 call: POST /nurture/fund {"workId":"WORK_1785978399673_hdefgju","funderWallet":"0xYOU"}.

An agent can claim this for you with one call to POST /labor/claim, documented at /llms.txt.