advanced work · tower-crane hoist, Atlanta, GA

OSHA Subpart CC crane & rigging pre-lift spotter survey, tower-crane hoist (Atlanta)

Fund it for $540. Proof lands onchain when it's done.

$540 proposed

This packet is not funded yet, so this figure is a proposed price and not money waiting in escrow. If a buyer funds it, approved proof settles that price onchain. If nobody funds it, approved proof earns provable credit toward the work instead of cash. You see which before you claim, never after.

Claiming is free. You sign to prove the wallet is yours: no card, no deposit, no fee.

What the work involves

A tower-crane hoist on a Atlanta, GA site is set up near overhead power lines without documented ground/outrigger, power-line clearance, swing-radius barricading, or rigging condition against OSHA Subpart CC. Power-line contact and crane tip-over are top crane fatalities.

Where
tower-crane hoist, Atlanta, GA · Open the map
Pay
$540 proposed

This packet is not funded yet, so this figure is a proposed price and not money waiting in escrow. If a buyer funds it, approved proof settles that price onchain. If nobody funds it, approved proof earns provable credit toward the work instead of cash. You see which before you claim, never after.

Proof
photo from a safe distance per checklist section + GPS + Subpart CC checklist + power-line/outrigger/swing-zone/rigging status + tiered findings routed to the lift director

This is exactly what gets it approved. Nothing settles without it.

Level
advanced
Open until
2026-09-05
Posted by
0x034F…6c89

The creator wallet. Its signature is what approves proof and settles the wage.

How this work is done

A documented method, so this packet comes out the same whoever does it. Typically 45–90 minutes. Method of record: OSHA 29 CFR 1926 Subpart CC (Cranes & Derricks in Construction, §§1926.1400–1442) pre-lift spotter survey: safe-distance observation of setup, clearances, and rigging; documentation only

Bring

  • hard hat + safety glasses + hi-vis vest (site PPE)
  • tablet/clipboard with the OSHA Subpart CC pre-lift checklist
  • camera with zoom (observe from a safe distance)
  • tape measure / measuring wheel (setback and barricade distances from the ground)
  • the crane's load chart / lift plan for reference
  • flashlight

Steps

  1. 1. Check in with the lift director / crane operator; confirm scope, don PPE, and confirm you observe-and-document from a safe distance only, you never rig, signal, level, or direct the lift (Subpart CC reserves these for the qualified rigger / signal person / operator).
  2. 2. Ground & setup: photograph and document firm/drained/level ground, full outrigger/stabilizer extension with pads/cribbing, and the crane's level indication (§§1926.1402/.1404).
  3. 3. Power-line clearance: identify overhead lines and confirm the planned swing/boom keeps the Table A minimum approach distance (default 20 ft for lines ≤350 kV) or that a documented de-energize / encroachment-prevention plan is in place (§1926.1408).
  4. 4. Swing radius / crush zone: confirm the area swept by the rotating superstructure (counterweight) is barricaded to keep workers out (§1926.1424).
  5. 5. Personnel & rigging: confirm a qualified signal person + an agreed signal method, a qualified rigger, the load chart / rated capacity posted, and slings/shackles/hooks (with safety latches) in serviceable condition per the rigger's inspection (§§1926.1419/.1425/.1428).
  6. 6. For each finding, mark the condition against the Subpart CC checklist item, assign a tier (stop-work / correct-before-proceed / monitor), and name the responsible lift director / qualified operator.
  7. 7. Enter photos, GPS/address, the checklist, and the tiered findings; sign. Route stop-work items to the lift director / operator with a timestamp, never direct or signal the lift.

If it does not match the plan

  • Planned swing/boom within the Table A minimum approach distance of an energized line (default <20 ft for lines ≤350 kV) with no de-energize/encroachment plan -> STOP-WORK: document, keep clear, route to the lift director; never direct the lift.
  • Outriggers/stabilizers not fully extended or on inadequate ground/cribbing, or a non-level crane -> STOP-WORK for the lift; route to the qualified operator; never operate or level it yourself.
  • Swing/crush zone not barricaded, no qualified signal person, or damaged rigging (no safety latch, cut/kinked sling) -> STOP-WORK; keep workers clear; route to the lift director / qualified rigger.
  • Any rigging, signaling, leveling, or lift direction -> observe-and-document only; the qualified rigger / signal person / operator performs and approves these. Approval and correction stay human.

What counts as done

  • Ground/outrigger setup photographed (firm/level, full extension, pads/cribbing, level indication)
  • Overhead power-line minimum-approach clearance (Table A, default 20 ft ≤350 kV) and swing-radius/crush-zone barricading confirmed and photographed
  • Qualified signal person + qualified rigger + posted load chart + serviceable rigging (slings/shackles/hooks with safety latches) documented
  • GPS / address confirm
  • Tiered findings list (stop-work / correct-before-proceed / monitor) with the lift director / qualified operator named + timestamp of stop-work items routed

Proof is measured against these, not judged by taste.

The money and the proof

What is promised, and what is not.

Funding this work is a purchase or a vote, same act: you either want this done here, or you want the world to contain it. A vote is free and signed; funding starts at one cent and anything beyond the wage is recorded as a premium for the worker. Either way the money settles only on accepted proof. An agent can fund it in one x402 call: POST /nurture/fund {"workId":"WORK_1785979588036_wc0dy5w","funderWallet":"0xYOU"}.

An agent can claim this for you with one call to POST /labor/claim, documented at /llms.txt.

Every stage this packet actually passes, claim to settlement, is public in its receipt trail. A stage that has not happened is not claimed.

Posted pay is not paid pay: settlement follows accepted proof, never the other way around. Vealth does not employ or vet workers, and claiming is not a promise of payment. See how proof and receipts work.