← Board

the public entrance and day-use parking area at Elephant Mountain Wildlife Management Area, SH 118 about 26 miles south of Alpine, Brewster County, TX 79830

Review desert water availability condition.

The general desert water availability condition supporting the guzzler network at Elephant Mountain WMA has not had a recent headquarters level review Read all of it

Not funded yet. Settles as earned credit, $80 proposed.

Proof it takes, the deadline, the level
  • Proofdocument only headquarters review note plus vegetation stress note plus GPS of headquarters plus ranked follow on note
  • Open until2026-11-05
  • Levelentry
All of it: the words, the place, the proof

The general desert water availability condition supporting the guzzler network at Elephant Mountain WMA has not had a recent headquarters level review, information the WMA biologist uses to prioritize which guzzler needs a licensed maintenance visit, without ever disclosing a specific guzzler's location.

Fund it for $80. Proof lands onchain when it's done.

Where
the public entrance and day-use parking area at Elephant Mountain Wildlife Management Area, SH 118 about 26 miles south of Alpine, Brewster County, TX 79830. Open the map
Pay
$80 proposed

This packet is not funded yet, so this figure is a proposed price and not money waiting in escrow. If a buyer funds it, approved proof settles that price onchain. If nobody funds it, approved proof earns provable credit toward the work instead of cash: recorded, and readable any time at vealth.net/labor/credit/(your wallet). You see which before you claim, never after.

Proof
document only headquarters review note plus vegetation stress note plus GPS of headquarters plus ranked follow on note

This is exactly what gets it approved. Nothing settles without it.

Level
entry: anyone can start here
Open until
2026-11-05
Posted by
0x034F…6c89

The creator wallet. Its signature is what approves proof and settles the wage.

How this work is done

How this work is done

A documented method, so this packet comes out the same whoever does it.

Steps

  1. 1. At the WMA headquarters or public access area, review the WMA's general posted desert water availability condition (recent rainfall, drought status) without visiting or disclosing any specific guzzler location. No water source (guzzler) or lambing area coordinate, or any landscape detail that would identify one, is recorded, photographed, or otherwise disclosed in this work; the location on file for this job is always the WMA headquarters or public access point, never the water source or lambing area itself.
  2. 2. Note any general vegetation moisture stress visible from the public access area as a water demand indicator.
  3. 3. Record a ranked follow on note naming the WMA's guzzler network generally (never a specific unit or coordinate) for a licensed TPWD guided debris clearing visit. Check the WMA's current permit-based seasonal public access rules and active hunt schedule before visiting, and wear blaze orange during an active hunting season.
  4. 4. Photograph only the public headquarters/access area itself, never any water development.

What counts as done

  • Note of the general posted water availability/drought condition reviewed at headquarters
  • Note of any general vegetation moisture stress observed from the public access area
  • Confirmation that this job never climbed, scrambled onto, or otherwise worked on escape terrain, and that all observation was made from the public road, a designated pull-off, or the WMA's public access area using optics; that no bighorn sheep was approached, followed, herded, or photographed at close range, and no drone was used; that if bighorn were visibly present at a water source the crew withdrew and did not work there while animals were present; that no water source or lambing area coordinate or identifying detail was recorded or disclosed, and the location on file is the WMA headquarters or a public access point; that no aoudad was culled, hunted, trapped, or handled at any skill level; and that current WMA permit-based access rules and the hunt schedule were checked before starting, with blaze orange worn in season.
  • Ranked follow on note naming the guzzler network generally for a licensed guided debris clearing visit
  • GPS waypoint of the WMA headquarters/public access point, never a water source

Proof is measured against these, not judged by taste.

What is promised, and what is not

Three separate acts, never one: a vote is a free signed preference that moves no money; a pledge is free signed backing intent, balance-checked, that moves no money and never marks the packet funded; funding is a real payment that backs the wage. Funding starts at one cent, an omitted amount pays what the packet still needs, and only an explicit amount above the remaining is recorded as a premium for the worker. Money settles only on accepted proof. An agent can fund it in one x402 call: POST /nurture/fund {"workId":"WORK_1785991599302_z74ry02","funderWallet":"0xYOU"}.

Open, but not claimable yet. restricted: permit-required. Regulated or permit-required work cannot be claimed on this rail yet. It stays readable; voting and pledging are free, and funding is separate from claiming.

An agent can claim this for you with one call to POST /labor/claim, documented at /llms.txt.

Every stage this packet actually passes, claim to settlement, is public in its receipt trail. A stage that has not happened is not claimed.

Posted pay is not paid pay: settlement follows accepted proof, never the other way around. Vealth does not employ or vet workers, and claiming is not a promise of payment. See how proof and receipts work.

Other acts: vote, pledge, fund

Packet WORK_1785991599302_z74ry02