Anyone can start here · Honey Creek State Natural Area guided-tour trailhead at the historic Rust House, accessed only during a scheduled Friends of Guadalupe River State Park and Honey Creek guided walk, 3350 Park Rd 31, Spring Branch, TX 78070
Document the karst spring recharge buffer's condition, the Honey Creek guided-tour trailhead
Fund it for $90. Proof lands onchain when it's done.
$90 proposed
This packet is not funded yet, so this figure is a proposed price and not money waiting in escrow. If a buyer funds it, approved proof settles that price onchain. If nobody funds it, approved proof earns provable credit toward the work instead of cash. You see which before you claim, never after.
Claiming is free. You sign to prove the wallet is yours: no card, no deposit, no fee.
What the work involvesThe vegetated buffer around the karst spring's recharge-to-discharge transition near the Honey Creek guided-tour trailhead has not had a recent stand off record; this buffer filters aquifer-fed water on its way from the spring outlet to the creek, distinct from a generic spring-run corridor.
How this work is done
A documented method, so this packet comes out the same whoever does it. Typically 30–60 minutes. Method of record: EPA dry-weather / AMD field screening
Bring
- GPS phone
- pH meter or strips
- conductivity meter
- ammonia + iron test kit as specified
- surfactant screen if specified
- gloves
- camera
Steps
- 1. Navigate to the outfall/reach; record GPS; photograph it, capturing any visible flow or staining.
- 2. Note whether flow is present in dry weather (yes/no).
- 3. Measure and record pH, conductivity, and each specified analyte per kit instructions.
- 4. Log any color, odor, floc, or aquatic-life observation.
- 5. Enter all readings with units, GPS, time, and photos into the proof record; sign.
If it does not match the plan
- Dry-weather flow present with elevated conductivity/ammonia/surfactants -> flag suspected illicit discharge for the responsible agency.
- pH < 6 with visible iron floc -> tag suspected acid mine drainage; recommend metals lab panel.
What counts as done
- Photo of the buffer condition taken from the guided tour route or the park's public day-use area
- Buffer width, plant cover, and any bare or eroded gap noted
- Confirmation that this job never entered Honey Creek State Natural Area outside a scheduled public guided tour; that it never entered the creek or spring, never touched or disturbed travertine or moss, and never collected any plant, animal, mineral, or water sample from the creek, spring, or river; that any river-adjacent work stayed bank-top only with the current weather and flash-flood forecast checked before starting; and that sturdy footwear, sun protection, and adequate water were carried given Hill Country heat and steep limestone footing.
- Ranked follow on note naming the buffer gap for a native-planting crew on the park's public ground
- GPS waypoint of the public vantage
Proof is measured against these, not judged by taste.
The standard this serves
Watershed Health. A watershed is everything the land pours into a stream, and the stream keeps the record. The EPA's bioassessment method reads that record through the small creatures living in the gravel: mayflies and caddisflies mean clean water, only worms and midges mean trouble. Mastery looks like a person who can wade one riffle with a net and tell you how the whole valley is doing. That skill is built sample by sample. This packet is one of them: one site, one careful count, one entry in the long record of a stream.
What is promised, and what is not.
Funding this work is a purchase or a vote, same act: you either want this done here, or you want the world to contain it. A vote is free and signed; funding starts at one cent and anything beyond the wage is recorded as a premium for the worker. Either way the money settles only on accepted proof. An agent can fund it in one x402 call: POST /nurture/fund {"workId":"WORK_1786011345307_xckqw59","funderWallet":"0xYOU"}.
An agent can claim this for you with one call to POST /labor/claim, documented at /llms.txt.
Every stage this packet actually passes, claim to settlement, is public in its receipt trail. A stage that has not happened is not claimed.
Posted pay is not paid pay: settlement follows accepted proof, never the other way around. Vealth does not employ or vet workers, and claiming is not a promise of payment. See how proof and receipts work.