intermediate work · the public day-use area near Park Headquarters, Guadalupe River State Park, 3350 Park Rd 31, Spring Branch, TX 78070
Remove invasive plants from the creek bank-top margin, Guadalupe River State Park's public day-use area, site 3
Fund it for $195. Proof lands onchain when it's done.
$195 proposed
This packet is not funded yet, so this figure is a proposed price and not money waiting in escrow. If a buyer funds it, approved proof settles that price onchain. If nobody funds it, approved proof earns provable credit toward the work instead of cash. You see which before you claim, never after.
Claiming is free. You sign to prove the wallet is yours: no card, no deposit, no fee.
What the work involvesThe survey above found invasive plant material crowding the bank-top margin near Guadalupe River State Park's public day-use area; hand removal from the bank top only, staying off the travertine and out of the water, restores native bank cover without disturbing the fragile creek community.
How this work is done
A documented method, so this packet comes out the same whoever does it. Typically 45–120 minutes. Method of record: Point-count / transect species survey (Breeding Bird Survey + Xerces pollinator-count protocols)
Bring
- binoculars
- field ID guide or app
- GPS phone
- data sheet / recorder
- timer
- camera
Steps
- 1. Navigate to the first survey point; record GPS; note start time, weather, and wind (surveys pause in rain/high wind).
- 2. Wait a settling minute, then run a fixed-duration count (e.g., 5 min) within a fixed radius; record every species seen/heard and the count of each.
- 3. Photograph the habitat and any species you can; note any threatened/target or invasive species.
- 4. Move to the next point along the transect (keep points >=200 m apart) and repeat the count.
- 5. Record total effort (points, duration) and observer.
- 6. Enter the per-point species lists + counts, GPS, weather, effort, and photos into the proof record; sign.
If it does not match the plan
- Threatened/at-risk or target species observed -> flag for the land steward (with location) for protection planning.
- Invasive species dominant / native diversity very low -> flag for a management plan.
- Rain or high wind -> pause/reschedule; counts under poor conditions are not valid.
What counts as done
- Before photo of the invasive-crowded bank margin
- Park staff approval of the removal location recorded
- Confirmation that this job never entered Honey Creek State Natural Area outside a scheduled public guided tour; that it never entered the creek or spring, never touched or disturbed travertine or moss, and never collected any plant, animal, mineral, or water sample from the creek, spring, or river; that any river-adjacent work stayed bank-top only with the current weather and flash-flood forecast checked before starting; and that sturdy footwear, sun protection, and adequate water were carried given Hill Country heat and steep limestone footing.
- Bagged material removed from site confirmed
- After photo of the cleared bank-top margin
Proof is measured against these, not judged by taste.
What is promised, and what is not.
Funding this work is a purchase or a vote, same act: you either want this done here, or you want the world to contain it. A vote is free and signed; funding starts at one cent and anything beyond the wage is recorded as a premium for the worker. Either way the money settles only on accepted proof. An agent can fund it in one x402 call: POST /nurture/fund {"workId":"WORK_1786011443014_czexmqv","funderWallet":"0xYOU"}.
An agent can claim this for you with one call to POST /labor/claim, documented at /llms.txt.
Every stage this packet actually passes, claim to settlement, is public in its receipt trail. A stage that has not happened is not claimed.
Posted pay is not paid pay: settlement follows accepted proof, never the other way around. Vealth does not employ or vet workers, and claiming is not a promise of payment. See how proof and receipts work.