intermediate work · Westlake Los Angeles Ca Mac

Cold-patch the potholes on the residential side streets off 7th St, Westlake, Los Angeles

Fund it for $140. Proof lands onchain when it's done.

$140 proposed

This packet is not funded yet, so this figure is a proposed price and not money waiting in escrow. If a buyer funds it, approved proof settles that price onchain. If nobody funds it, approved proof earns provable credit toward the work instead of cash. You see which before you claim, never after.

Claiming is free. You sign to prove the wallet is yours: no card, no deposit, no fee.

What the work involves

Potholes on the quiet residential streets around MacArthur Park jar every car, bike and stroller that crosses them, and each rain makes them wider. Cold-patching them by hand is the recurring surface care that keeps a street usable in the years between city repaves, and it is the middle rung between patching an alley and rebuilding a sidewalk panel.

Where
Westlake Los Angeles Ca Mac · residential side streets off 7th St near MacArthur Park, Westlake, Los Angeles, CA 90057 · Open the map
Pay
$140 proposed

This packet is not funded yet, so this figure is a proposed price and not money waiting in escrow. If a buyer funds it, approved proof settles that price onchain. If nobody funds it, approved proof earns provable credit toward the work instead of cash. You see which before you claim, never after.

Proof
before/after photo pairs per pothole + depth measurements + materials note + GPS

This is exactly what gets it approved. Nothing settles without it.

Level
intermediate
Open until
2027-08-06
Posted by
0x034F…6c89

The creator wallet. Its signature is what approves proof and settles the wage.

How this work is done

A documented method, so this packet comes out the same whoever does it. Typically 120–480 minutes. Method of record: Small-area concrete and asphalt repair in the public way (pothole cold patch, pavement and curb-face patch, gutter spall, stoop, trip-hazard grind) to ADA/PROWAG surface tolerances under a right-of-way permit, with wet-cut or vacuum dust controls.

Bring

  • right-of-way permit + cones, barricades and signage for a compliant work zone
  • cold-patch asphalt or the specified repair mortar, plus bonding agent
  • grinder or saw with a water feed or vacuum shroud (respirable silica control)
  • tamper or plate compactor, trowels, screed
  • smart level or 2-ft level + straightedge + tape measure
  • respirator, eye and hearing protection, gloves
  • camera + GPS phone

Steps

  1. 1. ASSESS: photograph the defect as found and measure it (vertical discontinuity, ponding depth, spall area, cross slope); record the numbers before touching anything.
  2. 2. Set the work zone: cones, barricades and a maintained pedestrian detour; confirm the right-of-way permit and, for anything cut into the ground, the honored 811 locate.
  3. 3. Square up and clean the repair area, removing loose and unsound material back to a sound edge; run every cut or grind wet or under vacuum, never dry.
  4. 4. Place the repair material in the specified lifts, compacting or consolidating each lift, and finish to match the surrounding grade and the drainage direction.
  5. 5. VERIFY: straightedge and level the finished patch, confirming vertical discontinuity at or under 1/4 in and cross slope at or under 2 percent; record both readings.
  6. 6. Photograph the finished repair from the before vantage, log the permit reference and the cure or reopen time, and enter them in the proof record.

If it does not match the plan

  • Any cutting or grinding without a water feed or vacuum shroud -> STOP: respirable silica control is not optional.
  • The failure is larger than the patch (undermining, a void under the slab, a sinkhole) -> document and route to the city engineer; do not patch over it.
  • No right-of-way permit, or no safe work zone off the traffic lane -> STOP: document from the sidewalk and report.

What counts as done

  • Before photo of each pothole with a ruler showing depth, plus GPS
  • After photo of each compacted patch from the matching vantage, flush with the pavement
  • Materials note (cold-patch mix, bags used, tamper passes) and the street segment covered

Proof is measured against these, not judged by taste.

The money and the proof

What is promised, and what is not.

Funding this work is a purchase or a vote, same act: you either want this done here, or you want the world to contain it. A vote is free and signed; funding starts at one cent and anything beyond the wage is recorded as a premium for the worker. Either way the money settles only on accepted proof. An agent can fund it in one x402 call: POST /nurture/fund {"workId":"WORK_1786013137188_n216v05","funderWallet":"0xYOU"}.

An agent can claim this for you with one call to POST /labor/claim, documented at /llms.txt.

Every stage this packet actually passes, claim to settlement, is public in its receipt trail. A stage that has not happened is not claimed.

Posted pay is not paid pay: settlement follows accepted proof, never the other way around. Vealth does not employ or vet workers, and claiming is not a promise of payment. See how proof and receipts work.