← Board

Pedernales Falls State Park headquarters and public day-use area, 2585 Park Rd 6026, Johnson City, TX 78636 (Blanco County)

Document the flood debris strandline.

A strandline of flood-deposited trash and debris at Pedernales Falls State Park's public day-use area bank top has not had a recent Read all of it

Not funded yet. Settles as earned credit, $80 proposed.

Proof it takes, the deadline, the level
  • Proofdocument only bank top stand off photo log plus debris type and volume note plus GPS plus ranked follow on note
  • Open until2026-11-05
  • Levelentry
All of it: the words, the place, the proof

A strandline of flood-deposited trash and debris at Pedernales Falls State Park's public day-use area bank top has not had a recent bank-top record; left in place it washes back into the scoured bedrock channel at the next high-water event.

Fund it for $80. Proof lands onchain when it's done.

Where
Pedernales Falls State Park headquarters and public day-use area, 2585 Park Rd 6026, Johnson City, TX 78636 (Blanco County). Open the map
Pay
$80 proposed

This packet is not funded yet, so this figure is a proposed price and not money waiting in escrow. If a buyer funds it, approved proof settles that price onchain. If nobody funds it, approved proof earns provable credit toward the work instead of cash: recorded, and readable any time at vealth.net/labor/credit/(your wallet). You see which before you claim, never after.

Proof
document only bank top stand off photo log plus debris type and volume note plus GPS plus ranked follow on note

This is exactly what gets it approved. Nothing settles without it.

Level
entry: anyone can start here
Open until
2026-11-05
Posted by
0x034F…6c89

The creator wallet. Its signature is what approves proof and settles the wage.

How this work is done

How this work is done

A documented method, so this packet comes out the same whoever does it.

Steps

  1. 1. From bank-top ground above the scour line, photograph the strandline of flood-deposited trash and debris left on the bank top after the river has receded. This work never enters the riverbed, never walks on the falls ledges or any bedrock ledge, never wades, never swims, and never crosses the channel at any skill level; the first three miles of the Pedernales River through this park, including the falls, are closed to swimming, wading, and tubing in real life because the scoured limestone channel and its flash floods have killed people here. All work stays bank-top, above and back from the visible scour line, on the maintained trail or behind a barrier at a designated overlook.
  2. 2. Note the debris type (plastic, foam, wood, metal) and approximate volume along the strandline.
  3. 3. This documents the recurring post-flood trash strandline problem specifically, distinct from a routine litter survey; state the stretch's location relative to a park landmark in the record.
  4. 4. Record a ranked follow on note naming the stretch for a debris-removal crew working on bank-top ground only.

What counts as done

  • Photo of the debris strandline taken from bank-top ground above the scour line
  • Debris type and approximate volume noted
  • Confirmation that this job never entered the riverbed, never walked on any bedrock ledge, never waded, swam, or crossed the channel, and stayed bank-top above the scour line on the maintained trail or behind a barrier at all times; that no water sample was collected and no plant was collected or its precise location published; that the weather forecast and watershed-wide flash-flood conditions were checked before starting with an immediate-departure plan if the water rose or changed; and that sun protection and adequate water were carried given Hill Country heat, limited shade on open bedrock, and limited cell coverage in the canyon.
  • Ranked follow on note naming the stretch for a debris-removal crew
  • GPS waypoint of the surveyed stretch

Proof is measured against these, not judged by taste.

What is promised, and what is not

Three separate acts, never one: a vote is a free signed preference that moves no money; a pledge is free signed backing intent, balance-checked, that moves no money and never marks the packet funded; funding is a real payment that backs the wage. Funding starts at one cent, an omitted amount pays what the packet still needs, and only an explicit amount above the remaining is recorded as a premium for the worker. Money settles only on accepted proof. An agent can fund it in one x402 call: POST /nurture/fund {"workId":"WORK_1786023100179_ewnw88u","funderWallet":"0xYOU"}.

Claiming is free. You sign to prove the wallet is yours: no card, no deposit, no fee. Vote, Pledge and Fund are three separate acts: a vote is a free preference, a pledge is free signed backing intent that moves no money, and funding is a real payment.

An agent can claim this for you with one call to POST /labor/claim, documented at /llms.txt.

Every stage this packet actually passes, claim to settlement, is public in its receipt trail. A stage that has not happened is not claimed.

Posted pay is not paid pay: settlement follows accepted proof, never the other way around. Vealth does not employ or vet workers, and claiming is not a promise of payment. See how proof and receipts work.

Other acts: vote, pledge, fund

Packet WORK_1786023100179_ewnw88u