Pedernales Falls State Park headquarters and public day-use area, 2585 Park Rd 6026, Johnson City, TX 78636 (Blanco County)
Remove flood debris from the bank-top strandline, Pedernales Falls State Park's public day-use area bank top, site 2.
A worker wearing gloves stands on bank top ground above the scour line at Pedernales Falls State Park headquarters and public day-use area, hand collects and bags flood debris from the strandline, then packs it out to the park receptacle. Read all of it
Not funded yet. Settles as earned credit, $100 proposed.
Proof it takes, the deadline, the level
- Proofpark staff approval confirm plus before after photos plus debris volume record plus GPS
- Open until2026-11-05
- Levelentry
All of it: the words, the place, the proof
The survey above found a trash and debris strandline at Pedernales Falls State Park's public day-use area bank top left by a past high-water event; hand collection and pack-out from bank-top ground keeps the debris from washing back into the scoured bedrock channel.
Offer to pay $100. The receipt lands onchain once the proof is approved.
Safety, read before you claim
Hand collection only, working from stable bank-top ground above the scour line at all times, gloves required for handling debris. This work never enters the riverbed, never walks on the falls ledges or any bedrock ledge, never wades, never swims, and never crosses the channel at any skill level; the first three miles of the Pedernales River through this park, including the falls, are closed to swimming, wading, and tubing in real life because the scoured limestone channel and its flash floods have killed people here. All work stays bank-top, above and back from the visible scour line, on the maintained trail or behind a barrier at a designated overlook. Wet limestone and algae-covered rock are lethally slick; no task in this batch requires standing on sloping or ledge rock at any level, and any overlook or trail-edge work stays behind the barrier or well back from the drop-off, never approaching the ledge edge to work. The Pedernales River can rise fast and without warning from rain falling upstream, out of sight, under a clear sky here at the park; check the current weather forecast and any flash-flood watch or warning for the whole watershed, not just the park, before starting, and leave the area immediately for high ground if the water begins to rise or the sound of the river changes. No water sample is ever collected from the river, any pool, or any seep at any skill level; no plant of any kind is ever collected; and no precise coordinate or description of a rare or unusual plant stand is ever published beyond the general work site. Venomous snakes, biting insects, and poison ivy are present along the bank-top trails and overlooks; watch foot and hand placement around rock, brush, and leaf litter at all times, and give any snake a wide path rather than approaching it. Texas Hill Country summer heat on open bedrock is severe, with no shade on the exposed limestone ledges and limited or no cell phone coverage in the river canyon; work only in early morning or late afternoon to avoid peak heat, carry more water than you think you need, wear sun protection, and tell someone your planned route and return time before starting.
How this work is done
How this work is done
A documented method, so this packet comes out the same whoever does it.
Steps
- 1. Photograph the debris strandline before starting, from bank-top ground above the scour line.
- 2. Confirm with park staff that the debris-removal area is approved and stays on bank-top ground above the visible scour line, never entering the scoured channel. This work never enters the riverbed, never walks on the falls ledges or any bedrock ledge, never wades, never swims, and never crosses the channel at any skill level; the first three miles of the Pedernales River through this park, including the falls, are closed to swimming, wading, and tubing in real life because the scoured limestone channel and its flash floods have killed people here. All work stays bank-top, above and back from the visible scour line, on the maintained trail or behind a barrier at a designated overlook.
- 3. Hand collect and bag the trash and debris along the strandline, sorting recyclables where the park's program allows, staying above the scour line at all times.
- 4. Pack out the bagged debris to the park's designated receptacle and photograph the cleared strandline.
What counts as done
- Before photo of the debris strandline
- Park staff approval of the removal area recorded
- Confirmation that this job never entered the riverbed, never walked on any bedrock ledge, never waded, swam, or crossed the channel, and stayed bank-top above the scour line on the maintained trail or behind a barrier at all times; that no water sample was collected and no plant was collected or its precise location published; that the weather forecast and watershed-wide flash-flood conditions were checked before starting with an immediate-departure plan if the water rose or changed; and that sun protection and adequate water were carried given Hill Country heat, limited shade on open bedrock, and limited cell coverage in the canyon.
- Debris type and volume removed recorded
- After photo of the cleared strandline
Proof is measured against these, not judged by taste.
What is promised, and what is not
Three separate acts, never one: a vote is a free signed preference that moves no money; a pledge is free signed backing intent, balance-checked, that moves no money and never marks the packet funded; funding is a real payment, made by the payer straight to the worker, with no Vealth fee. Paying Vealth is closed: Vealth takes no new card or wallet payment for a job. To fund a job, offer to pay the worker directly, then pay them yourself when you accept the proof, from your own wallet or by your own card or bank. From a wallet: prepare_token_offer, sign, submit_token_offer; after the proof is accepted you pay the worker on chain and the worker records it (prepare_token_settlement, or POST /labor/settle for USDC on Base). By card or bank: prepare_direct_offer, sign, submit_direct_offer; you pay the worker yourself and the worker records it with prepare_direct_settlement. Both are free, need no gas, and move no money through Vealth.
Claiming is free. You sign to prove the wallet is yours: no card, no deposit, no fee. Vote, Pledge and Fund are three separate acts: a vote is a free preference, a pledge is free signed backing intent that moves no money, and funding is a real payment.
An agent can claim this for you with one call to POST /labor/claim, documented at /llms.txt.
Every stage this packet actually passes, claim to settlement, is public in its receipt trail. A stage that has not happened is not claimed.
Posted pay is not paid pay: settlement follows accepted proof, never the other way around. Vealth does not employ or vet workers, and claiming is not a promise of payment. See how proof and receipts work.
Other acts: vote, pledge, fund
Packet WORK_1786023184830_71hu329