← Board

the public bank-top day-use area above the river, Pedernales Falls State Park, 2585 Park Rd 6026, Johnson City, TX 78636 (Blanco County)

Remove flood debris from the bank-top strandline, the park's public bank-top day-use area, site 1.

The survey above found a trash and debris strandline at the park's public bank-top day-use area left by a past high-water event Read all of it

Not funded yet. Settles as earned credit, $100 proposed.

Proof it takes, the deadline, the level
  • Proofpark staff approval confirm plus before after photos plus debris volume record plus GPS
  • Open until2026-11-05
  • Levelentry
All of it: the words, the place, the proof

The survey above found a trash and debris strandline at the park's public bank-top day-use area left by a past high-water event; hand collection and pack-out from bank-top ground keeps the debris from washing back into the scoured bedrock channel.

Fund it for $100. Proof lands onchain when it's done.

Where
the public bank-top day-use area above the river, Pedernales Falls State Park, 2585 Park Rd 6026, Johnson City, TX 78636 (Blanco County). Open the map
Pay
$100 proposed

This packet is not funded yet, so this figure is a proposed price and not money waiting in escrow. If a buyer funds it, approved proof settles that price onchain. If nobody funds it, approved proof earns provable credit toward the work instead of cash: recorded, and readable any time at vealth.net/labor/credit/(your wallet). You see which before you claim, never after.

Proof
park staff approval confirm plus before after photos plus debris volume record plus GPS

This is exactly what gets it approved. Nothing settles without it.

Level
entry: anyone can start here
Open until
2026-11-05
Posted by
0x034F…6c89

The creator wallet. Its signature is what approves proof and settles the wage.

How this work is done

How this work is done

A documented method, so this packet comes out the same whoever does it.

Steps

  1. 1. Photograph the debris strandline before starting, from bank-top ground above the scour line.
  2. 2. Confirm with park staff that the debris-removal area is approved and stays on bank-top ground above the visible scour line, never entering the scoured channel. This work never enters the riverbed, never walks on the falls ledges or any bedrock ledge, never wades, never swims, and never crosses the channel at any skill level; the first three miles of the Pedernales River through this park, including the falls, are closed to swimming, wading, and tubing in real life because the scoured limestone channel and its flash floods have killed people here. All work stays bank-top, above and back from the visible scour line, on the maintained trail or behind a barrier at a designated overlook.
  3. 3. Hand collect and bag the trash and debris along the strandline, sorting recyclables where the park's program allows, staying above the scour line at all times.
  4. 4. Pack out the bagged debris to the park's designated receptacle and photograph the cleared strandline.

What counts as done

  • Before photo of the debris strandline
  • Park staff approval of the removal area recorded
  • Confirmation that this job never entered the riverbed, never walked on any bedrock ledge, never waded, swam, or crossed the channel, and stayed bank-top above the scour line on the maintained trail or behind a barrier at all times; that no water sample was collected and no plant was collected or its precise location published; that the weather forecast and watershed-wide flash-flood conditions were checked before starting with an immediate-departure plan if the water rose or changed; and that sun protection and adequate water were carried given Hill Country heat, limited shade on open bedrock, and limited cell coverage in the canyon.
  • Debris type and volume removed recorded
  • After photo of the cleared strandline

Proof is measured against these, not judged by taste.

What is promised, and what is not

Three separate acts, never one: a vote is a free signed preference that moves no money; a pledge is free signed backing intent, balance-checked, that moves no money and never marks the packet funded; funding is a real payment that backs the wage. Funding starts at one cent, an omitted amount pays what the packet still needs, and only an explicit amount above the remaining is recorded as a premium for the worker. Money settles only on accepted proof. An agent can fund it in one x402 call: POST /nurture/fund {"workId":"WORK_1786023197853_djnrznj","funderWallet":"0xYOU"}.

Claiming is free. You sign to prove the wallet is yours: no card, no deposit, no fee. Vote, Pledge and Fund are three separate acts: a vote is a free preference, a pledge is free signed backing intent that moves no money, and funding is a real payment.

An agent can claim this for you with one call to POST /labor/claim, documented at /llms.txt.

Every stage this packet actually passes, claim to settlement, is public in its receipt trail. A stage that has not happened is not claimed.

Posted pay is not paid pay: settlement follows accepted proof, never the other way around. Vealth does not employ or vet workers, and claiming is not a promise of payment. See how proof and receipts work.

Other acts: vote, pledge, fund

Packet WORK_1786023197853_djnrznj