the public bank access near the US 59 Corrigan Relief Route corridor bridge over Bear Creek, west of Corrigan, Polk County, TX 75939
Count and classify the downed wood.
Nobody has ever counted or classified the downed wood sitting in and along Bear Creek near Corrigan, Polk County, TX; the county Read all of it
Not funded yet. Settles as earned credit, $85 proposed.
Proof it takes, the deadline, the level
- Proofstand off photo log of the wood in view plus size class and infrastructure/open tally plus wood loading rating plus GPS
- Open until2026-11-09
- Levelentry
All of it: the words, the place, the proof
Nobody has ever counted or classified the downed wood sitting in and along Bear Creek near Corrigan, Polk County, TX; the county road and bridge department only hears about this wood when it jams against the US 59 bridge, so a piece resting safely in the open channel a hundred feet upstream, doing real work as fish cover, gets the same worried phone call as a piece actually stuck on the piers. A simple photo count from the bridge deck or bank, sorted by size class and by whether a piece sits against infrastructure or out in the open channel, turns that guesswork into a real record.
Fund it for $85. Proof lands onchain when it's done.
How this work is done
How this work is done
A documented method, so this packet comes out the same whoever does it.
Steps
- 1. From the US 59 bridge deck sidewalk or the firm public bank, photograph the general reach of Bear Creek in view before counting anything, and check that the water is not visibly high, fast, or muddy.
- 2. Count each visible piece of downed wood (log, large branch, or root wad) in or touching the water, noting an approximate size class (small branch, log, or root wad/whole tree) for each.
- 3. For each piece, note whether it sits against a pier, culvert, or crossing structure (infrastructure) or out in the open channel or floodplain margin (open), without touching or entering the water to check.
- 4. Record the total count by size class and by infrastructure/open split, and rate the reach's apparent wood loading as low, moderate, or high.
What counts as done
- Wide photo of the general reach from the bridge deck or bank vantage
- Tally of downed wood pieces by size class and by infrastructure/open split
- Short wood loading rating (low, moderate, or high) with the reasoning written out
- Confirmation that this work never entered flowing water or waded into the channel, never used a chainsaw or power tool (except the licensed advanced placement crew), and never pried, dragged, cut, repositioned, or removed any log, branch, or root wad already in or touching the water; that the work stayed on the bridge deck, shoulder, or firm public bank ground well clear of the water line; that the water was checked and was not visibly high, fast, or muddy before starting; and that this survey/report/marker never argued against or contradicted the removal of wood that threatens a pier, culvert, bridge footing, or public crossing, in compliance with the vein's full safety stack.
- GPS waypoint of the public bridge deck or bank vantage
Proof is measured against these, not judged by taste.
The standard this serves
Watershed Health. A watershed is everything the land pours into a stream, and the stream keeps the record. The EPA's bioassessment method reads that record through the small creatures living in the gravel: mayflies and caddisflies mean clean water, only worms and midges mean trouble. Mastery looks like a person who can wade one riffle with a net and tell you how the whole valley is doing. That skill is built sample by sample. This packet is one of them: one site, one careful count, one entry in the long record of a stream.
What is promised, and what is not
Three separate acts, never one: a vote is a free signed preference that moves no money; a pledge is free signed backing intent, balance-checked, that moves no money and never marks the packet funded; funding is a real payment that backs the wage. Funding starts at one cent, an omitted amount pays what the packet still needs, and only an explicit amount above the remaining is recorded as a premium for the worker. Money settles only on accepted proof. An agent can fund it in one x402 call: POST /nurture/fund {"workId":"WORK_1786342577865_g6pl3wm","funderWallet":"0xYOU"}.
Claiming is free. You sign to prove the wallet is yours: no card, no deposit, no fee. Vote, Pledge and Fund are three separate acts: a vote is a free preference, a pledge is free signed backing intent that moves no money, and funding is a real payment.
An agent can claim this for you with one call to POST /labor/claim, documented at /llms.txt.
Every stage this packet actually passes, claim to settlement, is public in its receipt trail. A stage that has not happened is not claimed.
Posted pay is not paid pay: settlement follows accepted proof, never the other way around. Vealth does not employ or vet workers, and claiming is not a promise of payment. See how proof and receipts work.
Other acts: vote, pledge, fund
Packet WORK_1786342577865_g6pl3wm