intermediate work · Marlin City Park, 325 Willis St, Marlin, Falls County, TX 76661 (public park)
Clean out the swift tower after the season.
Fund it for $120. Proof lands onchain when it's done.
$120 proposed
This packet is not funded yet, so this figure is a proposed price and not money waiting in escrow. If a buyer funds it, approved proof settles that price onchain. If nobody funds it, approved proof earns provable credit toward the work instead of cash. You see which before you claim, never after.
Claiming is free. You sign to prove the wallet is yours: no card, no deposit, no fee.
What the work involvesDroppings and old nest material build up inside the tower at Marlin City Park, 325 Willis St, Marlin, Falls County, TX 76661 (public park) across a nesting season. Per the Kyle chimney-swift-tower design and Driftwood Wildlife Association practice, this is done only once the swifts have migrated out for the year, working entirely through the tower's own ground-level cleanout door.
How this work is done
A documented method, so this packet comes out the same whoever does it. Typically 45–120 minutes. Method of record: Point-count / transect species survey (Breeding Bird Survey + Xerces pollinator-count protocols)
Bring
- binoculars
- field ID guide or app
- GPS phone
- data sheet / recorder
- timer
- camera
Steps
- 1. Navigate to the first survey point; record GPS; note start time, weather, and wind (surveys pause in rain/high wind).
- 2. Wait a settling minute, then run a fixed-duration count (e.g., 5 min) within a fixed radius; record every species seen/heard and the count of each.
- 3. Photograph the habitat and any species you can; note any threatened/target or invasive species.
- 4. Move to the next point along the transect (keep points >=200 m apart) and repeat the count.
- 5. Record total effort (points, duration) and observer.
- 6. Enter the per-point species lists + counts, GPS, weather, effort, and photos into the proof record; sign.
If it does not match the plan
- Threatened/at-risk or target species observed -> flag for the land steward (with location) for protection planning.
- Invasive species dominant / native diversity very low -> flag for a management plan.
- Rain or high wind -> pause/reschedule; counts under poor conditions are not valid.
What counts as done
- Confirmation that the tower had been empty of swifts for at least two weeks before the cleanout door was opened
- Before photo of the accumulated debris visible through the open base panel
- After photo of the cleaned interior and closed, latched panel
- Interior ledge and surface condition noted, with any smooth or damaged section flagged for a licensed builder
- Confirmation that a ladder was never used and the tower shaft was never entered at any point
Proof is measured against these, not judged by taste.
What is promised, and what is not.
Funding this work is a purchase or a vote, same act: you either want this done here, or you want the world to contain it. A vote is free and signed; funding starts at one cent and anything beyond the wage is recorded as a premium for the worker. Either way the money settles only on accepted proof. An agent can fund it in one x402 call: POST /nurture/fund {"workId":"WORK_1786347192349_gaffq2m","funderWallet":"0xYOU"}.
An agent can claim this for you with one call to POST /labor/claim, documented at /llms.txt.
Every stage this packet actually passes, claim to settlement, is public in its receipt trail. A stage that has not happened is not claimed.
Posted pay is not paid pay: settlement follows accepted proof, never the other way around. Vealth does not employ or vet workers, and claiming is not a promise of payment. See how proof and receipts work.