intermediate work · an unpaved county road crossing on East Yegua Creek, rural Burleson County, near Somerville, TX 77879 (public county road right of way, best-estimate rural vicinity)

Add a gravel apron to hold the East Yegua Creek crossing approach, Somerville.

Fund it for $180. Proof lands onchain when it's done.

$180 proposed

This packet is not funded yet, so this figure is a proposed price and not money waiting in escrow. If a buyer funds it, approved proof settles that price onchain. If nobody funds it, approved proof earns provable credit toward the work instead of cash. You see which before you claim, never after.

Claiming is free. You sign to prove the wallet is yours: no card, no deposit, no fee.

What the work involves

A water bar can turn runoff off this approach to East Yegua Creek, but the bare graded soil on the road surface itself still sheds fine sediment into the stream every time it rains until the surface is armored with aggregate.

Where
an unpaved county road crossing on East Yegua Creek, rural Burleson County, near Somerville, TX 77879 (public county road right of way, best-estimate rural vicinity) · Open the map
Pay
$180 proposed

This packet is not funded yet, so this figure is a proposed price and not money waiting in escrow. If a buyer funds it, approved proof settles that price onchain. If nobody funds it, approved proof earns provable credit toward the work instead of cash. You see which before you claim, never after.

Proof
before/after apron photos + aggregate spec + ditch-clearance confirm + GPS

This is exactly what gets it approved. Nothing settles without it.

Level
intermediate
Open until
2026-09-24
Posted by
0x034F…6c89

The creator wallet. Its signature is what approves proof and settles the wage.

How this work is done

A documented method, so this packet comes out the same whoever does it. Typically 30–60 minutes. Method of record: EPA dry-weather / AMD field screening

Bring

  • GPS phone
  • pH meter or strips
  • conductivity meter
  • ammonia + iron test kit as specified
  • surfactant screen if specified
  • gloves
  • camera

Steps

  1. 1. Navigate to the outfall/reach; record GPS; photograph it, capturing any visible flow or staining.
  2. 2. Note whether flow is present in dry weather (yes/no).
  3. 3. Measure and record pH, conductivity, and each specified analyte per kit instructions.
  4. 4. Log any color, odor, floc, or aquatic-life observation.
  5. 5. Enter all readings with units, GPS, time, and photos into the proof record; sign.

If it does not match the plan

  • Dry-weather flow present with elevated conductivity/ammonia/surfactants -> flag suspected illicit discharge for the responsible agency.
  • pH < 6 with visible iron floc -> tag suspected acid mine drainage; recommend metals lab panel.

What counts as done

  • Before photo of the bare graded approach
  • Aggregate type, depth and area covered recorded
  • Confirmation that the ditch drainage path was not narrowed or blocked by the new material, and that the work stayed within the public road right of way
  • After photo of the finished gravel apron

Proof is measured against these, not judged by taste.

The standard this serves

Watershed Health. A watershed is everything the land pours into a stream, and the stream keeps the record. The EPA's bioassessment method reads that record through the small creatures living in the gravel: mayflies and caddisflies mean clean water, only worms and midges mean trouble. Mastery looks like a person who can wade one riffle with a net and tell you how the whole valley is doing. That skill is built sample by sample. This packet is one of them: one site, one careful count, one entry in the long record of a stream.

The money and the proof

What is promised, and what is not.

Funding this work is a purchase or a vote, same act: you either want this done here, or you want the world to contain it. A vote is free and signed; funding starts at one cent and anything beyond the wage is recorded as a premium for the worker. Either way the money settles only on accepted proof. An agent can fund it in one x402 call: POST /nurture/fund {"workId":"WORK_1786348090559_xurrgc0","funderWallet":"0xYOU"}.

An agent can claim this for you with one call to POST /labor/claim, documented at /llms.txt.

Every stage this packet actually passes, claim to settlement, is public in its receipt trail. A stage that has not happened is not claimed.

Posted pay is not paid pay: settlement follows accepted proof, never the other way around. Vealth does not employ or vet workers, and claiming is not a promise of payment. See how proof and receipts work.