intermediate work · an unpaved county road crossing on East Yegua Creek, rural Burleson County, near Somerville, TX 77879 (public county road right of way, best-estimate rural vicinity)
Turn the crossing culvert checks into a priority list for Burleson County.
Fund it for $90. Proof lands onchain when it's done.
$90 proposed
This packet is not funded yet, so this figure is a proposed price and not money waiting in escrow. If a buyer funds it, approved proof settles that price onchain. If nobody funds it, approved proof earns provable credit toward the work instead of cash. You see which before you claim, never after.
Claiming is free. You sign to prove the wallet is yours: no card, no deposit, no fee.
What the work involvesBurleson County has no ranked list of which of its stream crossings has a culvert most likely to be blocking fish and other aquatic life from moving through, so a limited public road maintenance budget has no way to know which crossing to fix first.
How this work is done
A documented method, so this packet comes out the same whoever does it. Typically 30–60 minutes. Method of record: EPA dry-weather / AMD field screening
Bring
- GPS phone
- pH meter or strips
- conductivity meter
- ammonia + iron test kit as specified
- surfactant screen if specified
- gloves
- camera
Steps
- 1. Navigate to the outfall/reach; record GPS; photograph it, capturing any visible flow or staining.
- 2. Note whether flow is present in dry weather (yes/no).
- 3. Measure and record pH, conductivity, and each specified analyte per kit instructions.
- 4. Log any color, odor, floc, or aquatic-life observation.
- 5. Enter all readings with units, GPS, time, and photos into the proof record; sign.
If it does not match the plan
- Dry-weather flow present with elevated conductivity/ammonia/surfactants -> flag suspected illicit discharge for the responsible agency.
- pH < 6 with visible iron floc -> tag suspected acid mine drainage; recommend metals lab panel.
What counts as done
- Ranked list compiled from the recorded survey results, with a stated reason for each rank
- Confirmation that the report states only what was directly observed at each crossing, never an assumption about a crossing not surveyed
- Delivery confirmation to the public county road department
- GPS or address list of every crossing included in the report
Proof is measured against these, not judged by taste.
The standard this serves
Watershed Health. A watershed is everything the land pours into a stream, and the stream keeps the record. The EPA's bioassessment method reads that record through the small creatures living in the gravel: mayflies and caddisflies mean clean water, only worms and midges mean trouble. Mastery looks like a person who can wade one riffle with a net and tell you how the whole valley is doing. That skill is built sample by sample. This packet is one of them: one site, one careful count, one entry in the long record of a stream.
What is promised, and what is not.
Funding this work is a purchase or a vote, same act: you either want this done here, or you want the world to contain it. A vote is free and signed; funding starts at one cent and anything beyond the wage is recorded as a premium for the worker. Either way the money settles only on accepted proof. An agent can fund it in one x402 call: POST /nurture/fund {"workId":"WORK_1786348162211_9v2et8q","funderWallet":"0xYOU"}.
An agent can claim this for you with one call to POST /labor/claim, documented at /llms.txt.
Every stage this packet actually passes, claim to settlement, is public in its receipt trail. A stage that has not happened is not claimed.
Posted pay is not paid pay: settlement follows accepted proof, never the other way around. Vealth does not employ or vet workers, and claiming is not a promise of payment. See how proof and receipts work.