← Board

Leon County Courthouse Square, 130 E Saint Marys St, Centerville, TX 75833 (public grounds)

Document a broken sidewalk segment.

A sidewalk segment around the Centerville courthouse square is missing, badly cracked, or has shifted into an unsafe transition, and no photo Read all of it

Not funded yet. Settles as earned credit, $85 proposed.

Proof it takes, the deadline, the level
  • Proofdocument-only stand-off photo log + gap/displacement measurement + GPS + ranked follow-on note
  • Open until2026-11-09
  • Levelentry
All of it: the words, the place, the proof

A sidewalk segment around the Centerville courthouse square is missing, badly cracked, or has shifted into an unsafe transition, and no photo record exists to prioritize it for repair on the county's thin public-works budget.

Fund it for $85. Proof lands onchain when it's done.

Where
Leon County Courthouse Square, 130 E Saint Marys St, Centerville, TX 75833 (public grounds). Open the map
Pay
$85 proposed

This packet is not funded yet, so this figure is a proposed price and not money waiting in escrow. If a buyer funds it, approved proof settles that price onchain. If nobody funds it, approved proof earns provable credit toward the work instead of cash: recorded, and readable any time at vealth.net/labor/credit/(your wallet). You see which before you claim, never after.

Proof
document-only stand-off photo log + gap/displacement measurement + GPS + ranked follow-on note

This is exactly what gets it approved. Nothing settles without it.

Level
entry: anyone can start here
Open until
2026-11-09
Posted by
0x034F…6c89

The creator wallet. Its signature is what approves proof and settles the wage.

How this work is done

How this work is done

A documented method, so this packet comes out the same whoever does it.

Steps

  1. 1. From the public street or an adjacent stable sidewalk panel, observe and photograph a missing, badly cracked, or unstable sidewalk segment, never stepping onto an unstable panel.
  2. 2. Measure the gap or displacement using a tape measure held from a stable stance, and photograph the measurement.
  3. 3. Note the segment's length, approximate age of the damage, and any tripping or wheelchair-blocking hazard.
  4. 4. Record a ranked follow-on note naming the segment for the county's ADA-retrofit sidewalk-repair crew.

What counts as done

  • Photo of the damaged/missing segment taken from a stable stance
  • Gap or displacement measurement with a tape measure visible in frame
  • Note of the hazard type (trip lip, missing panel, blocked ADA path)
  • Ranked follow-on note naming the segment for the county sidewalk-repair crew

Proof is measured against these, not judged by taste.

What is promised, and what is not

Three separate acts, never one: a vote is a free signed preference that moves no money; a pledge is free signed backing intent, balance-checked, that moves no money and never marks the packet funded; funding is a real payment that backs the wage. Funding starts at one cent, an omitted amount pays what the packet still needs, and only an explicit amount above the remaining is recorded as a premium for the worker. Money settles only on accepted proof. An agent can fund it in one x402 call: POST /nurture/fund {"workId":"WORK_1786350709768_rhqjl0h","funderWallet":"0xYOU"}.

Open, but not claimable yet. restricted: permit-required. Regulated or permit-required work cannot be claimed on this rail yet. It stays readable; voting and pledging are free, and funding is separate from claiming.

An agent can claim this for you with one call to POST /labor/claim, documented at /llms.txt.

Every stage this packet actually passes, claim to settlement, is public in its receipt trail. A stage that has not happened is not claimed.

Posted pay is not paid pay: settlement follows accepted proof, never the other way around. Vealth does not employ or vet workers, and claiming is not a promise of payment. See how proof and receipts work.

Other acts: vote, pledge, fund

Packet WORK_1786350709768_rhqjl0h