advanced work · Urban construction site, Guadalajara, Mexico
Walk Urban construction site, Guadalajara, Mexico for safety hazards against the international construction standard.
Fund it for $220. Proof lands onchain when it's done.
$220 proposed
This packet is not funded yet, so this figure is a proposed price and not money waiting in escrow. If a buyer funds it, approved proof settles that price onchain. If nobody funds it, approved proof earns provable credit toward the work instead of cash. You see which before you claim, never after.
Claiming is free. You sign to prove the wallet is yours: no card, no deposit, no fee.
What the work involvesUrban construction site, Guadalajara, Mexico relies on the crew's own checks with no third-party safety documentation. Walk it against the ILO C167 international construction-safety checklist (and the stricter local rule) and route any stop-work hazard to the responsible person.
How this work is done
A documented method, so this packet comes out the same whoever does it.
Bring
- site PPE (hard hat / eye protection / hi-vis per site)
- tablet/clipboard with the ILO C167 checklist
- camera
- tape measure
- note on the national OSH requirements + the responsible/competent person
Steps
- 1. Check in with the site's responsible/competent person; confirm scope, don PPE, and confirm you observe-and-document only. Note the applicable national OSH law (ILO C167 is the floor).
- 2. Walk fall exposure: photograph unprotected edges/openings, guardrails/covers, and any fall-arrest anchorage in use (ILO C167 Art. 24, work at height).
- 3. Inspect scaffold and ladder condition: footing, ties, planking, guardrails; ladder pitch and tie-off (ILO C167 Art. 14-15).
- 4. Screen temporary electrical: cord/panel condition, isolation, and protection against contact (ILO C167 Art. 21).
- 5. Record housekeeping, access/egress, and PPE provision + use (ILO C167 Art. 28-30).
- 6. Tier each finding against ILO C167 / national law (stop-work / correct-before-proceed / monitor) and name the responsible person.
- 7. Enter photos, GPS/address, the checklist, and the tiered findings; sign. Route stop-work items to the responsible person with a timestamp.
What counts as done
- Photos of fall-exposure, scaffold/ladder, temporary-electrical, and housekeeping/PPE conditions
- GPS / address confirm
- ILO C167 checklist with the applicable national OSH reference noted
- Tiered findings list (stop-work / correct-before-proceed / monitor) with the responsible person named
- Timestamp of stop-work items routed to the responsible person
Proof is measured against these, not judged by taste.
What is promised, and what is not.
Funding this work is a purchase or a vote, same act: you either want this done here, or you want the world to contain it. A vote is free and signed; funding starts at one cent and anything beyond the wage is recorded as a premium for the worker. Either way the money settles only on accepted proof. An agent can fund it in one x402 call: POST /nurture/fund {"workId":"WORK_1786408763999_c1jyvn8","funderWallet":"0xYOU"}.
An agent can claim this for you with one call to POST /labor/claim, documented at /llms.txt.
Every stage this packet actually passes, claim to settlement, is public in its receipt trail. A stage that has not happened is not claimed.
Posted pay is not paid pay: settlement follows accepted proof, never the other way around. Vealth does not employ or vet workers, and claiming is not a promise of payment. See how proof and receipts work.