Anyone can start here · Heat-pump + panel retrofit site, Hartford, CT
Walk the safety checklist.
Fund it for $548. Proof lands onchain when it's done.
$548 proposed
This packet is not funded yet, so this figure is a proposed price and not money waiting in escrow. If a buyer funds it, approved proof settles that price onchain. If nobody funds it, approved proof earns provable credit toward the work instead of cash. You see which before you claim, never after.
Claiming is free. You sign to prove the wallet is yours: no card, no deposit, no fee.
What the work involvesA heat-pump + panel retrofit site in Hartford, CT needs an independent, documented pre-task safety walk against the standard checklist, never trade work, only observation, photos, and a tiered findings list routed to the site's competent person.
How this work is done
A documented method, so this packet comes out the same whoever does it.
Bring
- tablet/clipboard with the readiness checklist
- camera
- tape measure
- flashlight (panel/attic/crawl)
- note on existing HVAC + water-heating fuel and age
- thermal/IR camera (optional, insulation scope)
Steps
- 1. Confirm the address + scope with the owner/occupant and arrange access to the mechanical room, electrical panel, and attic/crawl. Observe-and-document only: no panel or HVAC work.
- 2. Inventory existing space + water heating: fuel (gas/electric/oil/propane), system type + age, ducted vs. ductless suitability, and any combustion appliance present (for later decommission planning by a pro).
- 3. Photograph the electrical panel label: main service amperage, panel make, and count of used vs. spare breaker slots; note obvious constraints (full panel, subpanels, aluminum branch wiring), as inputs for a licensed electrician's load calc, NOT a load calc yourself.
- 4. Record the envelope/insulation baseline: attic/wall/floor insulation presence + approximate R-level where visible, and obvious air-leakage points; use IR imaging if available.
- 5. Assemble a heat-pump readiness summary: what a conversion would likely require (panel capacity, dedicated circuit, ducting/ductless, envelope improvements) as a ranked readiness list, framed as inputs for licensed pros, not a design.
- 6. Enter photos, GPS/address, the inventory, panel observations, insulation baseline, and the ranked readiness list; sign. Route panel/service and combustion-decommission questions to licensed pros.
What counts as done
- Photos of existing heating/water-heating systems with fuel + type + age
- Photo of the electrical panel label with amperage + spare slots recorded
- Insulation/air-sealing baseline note
- GPS / address confirm
- Ranked heat-pump readiness list for a licensed pro
Proof is measured against these, not judged by taste.
What is promised, and what is not.
Funding this work is a purchase or a vote, same act: you either want this done here, or you want the world to contain it. A vote is free and signed; funding starts at one cent and anything beyond the wage is recorded as a premium for the worker. Either way the money settles only on accepted proof. An agent can fund it in one x402 call: POST /nurture/fund {"workId":"WORK_1786409180896_um7fosd","funderWallet":"0xYOU"}.
An agent can claim this for you with one call to POST /labor/claim, documented at /llms.txt.
Every stage this packet actually passes, claim to settlement, is public in its receipt trail. A stage that has not happened is not claimed.
Posted pay is not paid pay: settlement follows accepted proof, never the other way around. Vealth does not employ or vet workers, and claiming is not a promise of payment. See how proof and receipts work.