advanced work · Stephenville City Hall, 298 W Washington St, Stephenville, TX 76401 (public city hall, City of Stephenville, best-estimate location near the confirmed address), the approved restriped row
Restripe the approved row and plant the reclaimed strip, Stephenville City Hall, Stephenville, TX.
Fund it for $950. Proof lands onchain when it's done.
$950 proposed
This packet is not funded yet, so this figure is a proposed price and not money waiting in escrow. If a buyer funds it, approved proof settles that price onchain. If nobody funds it, approved proof earns provable credit toward the work instead of cash. You see which before you claim, never after.
Claiming is free. You sign to prove the wallet is yours: no card, no deposit, no fee.
What the work involvesThe approved one-row restripe plan for Stephenville City Hall exists but the paint is still the old, wider pattern and the strip it would free is still bare asphalt; the design act only becomes real ground when the row is actually repainted and the freed strip actually planted.
How this work is done
A documented method, so this packet comes out the same whoever does it.
Steps
- 1. A licensed pavement-marking contractor closes the target row (cones, hi-vis, off-hours or a closed section) before any paint work begins.
- 2. The contractor grinds out or covers the old stripe lines and repaints the row to the approved narrower plan, matching the delivered sketch exactly.
- 3. A landscape crew breaks or removes the freed asphalt strip only where the plan calls for planting, amends the soil, and plants low, salt- and oil-tolerant groundcover or shrubs, never a full-size tree this close to the drive aisle.
- 4. The crew mulches the strip and photographs the finished row with the new striping and the planted strip both visible.
What counts as done
- Written approval reference to the delivered restripe plan
- Photo of the repainted row matching the approved narrower striping
- Photo of the planted strip with mulch applied
- Confirmation that the total marked-space count matches the approved plan
Proof is measured against these, not judged by taste.
The standard this serves
Green Stormwater Infrastructure. Green stormwater infrastructure is the city's way of handling rain the way a meadow does: rain gardens, planted swales, and permeable pavement that let a storm soak in instead of surging down a pipe. The EPA's inspection standard keeps these systems honest, because a neglected rain garden quietly stops working while still looking like a garden. Mastery is the inspector's eye: reading inlets, overflow, plants, and soil in a single practiced pass. This packet is one such inspection, one basin checked and one record filed, which is precisely how a thousand basins stay alive.
What is promised, and what is not.
Funding this work is a purchase or a vote, same act: you either want this done here, or you want the world to contain it. A vote is free and signed; funding starts at one cent and anything beyond the wage is recorded as a premium for the worker. Either way the money settles only on accepted proof. An agent can fund it in one x402 call: POST /nurture/fund {"workId":"WORK_1786410452095_zmx1379","funderWallet":"0xYOU"}.
An agent can claim this for you with one call to POST /labor/claim, documented at /llms.txt.
Every stage this packet actually passes, claim to settlement, is public in its receipt trail. A stage that has not happened is not claimed.
Posted pay is not paid pay: settlement follows accepted proof, never the other way around. Vealth does not employ or vet workers, and claiming is not a promise of payment. See how proof and receipts work.